My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE33883
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE33883
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:07 PM
Creation date
11/21/2007 1:56:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1989074
IBM Index Class Name
Enforcement
Doc Date
2/8/1994
Doc Name
SETTLEMENT AGREEMENT
Violation No.
CV1993152
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiu iii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department o(Natural Resources <br />1313 Sherman 51., Room 215 <br />Denver, CO 80203 <br />Phone: 13031 866-3567 <br />FAX:1303)832-8106 <br />SETTLEMENT AGREEMENT <br />Cessation Order No. <br />Notice of Violation No. C-~3-152 <br />Roy Romer <br />Governor <br />Michael B. Long <br />Division Dveuor <br />Mine:Rimrock Strip Mine Permit No. C-89-074 <br />Permittee: ~imrock Coal Company <br />Mailing Address: <br />Operator: (If other than Permittee): Landmark Reclamation. Inc. <br />Mailing Address: 4901 S. Windermere Littleton, CO 80120 <br />County: Las Animas Type of Mine: Surface/Private <br />The Mined Land Reclamation Division ("The Division") issued a certain <br />Notice of Proposed Amount of Civil Penalty, and the operator requested <br />a conference thereon, as authorized by C.R.S. 1973, 34-33-123(8). <br />The requested conference having been held as required by law, on <br />January 25, 1993, the Division and the operator hereby agree as <br />follows: <br />1. The amount of the penalty shall be $650.00 <br />2. The penalty shall be paid to the Division by the operator not <br />later than 30 days from the date thereof; <br />3. Payment of such penalty by the operator shall constitute a <br />waiver of all further rights to review of such penalty or of <br />the violation on which it is. based. <br />This agreement shall not be effective unless signed by the operator <br />within ten days after the closing date of such conference, which date <br />is set forth below opposite the signature of the Conference Officer. <br />If not so signed, the Division will fix the penalty at whatever amount <br />it deems appropriate, based upon the factors referred to in C.R.S. <br />1973, 34-33-123(8)(d). <br />DATE: <br />Operator <br />by <br />DIVISION OF MINERALS AND GEOLOGY <br />DATE : ~-J S / I `F g ~ ,. ~-~ ~z.sT--~ <br />Y <br />Conference Officer <br />Penalty Adjustment Reviewed By <br />[Rule 5.04.3(4)(c)] <br />C.R.S. 34-33-123(8)(c)(d) <br />pF Cp,O <br />~~ r~ <br />e <br />~`'' <br />•~/e 76 ~• <br />Division Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.