Laserfiche WebLink
it 9S .q. � eel J1 <br />s 9 Y <br />s <br />i <br />-�, i <br />r. <br />I' <br />g qq i t� <br />E i <br />6 ^1 <br />I <br />I <br />t <br />r I . <br />DNS <br />7 <br />ilk- <br />s "V p' ir A` <br />� :..., <br />'AiF <br />, 1 } r <br />Ar� t <br />� fr <br />, <br />,� •e � i , ��� a � r�� , <br />100YR FLOODWAY Q ,; <br />R� <br />`a A id s <br />Mot <br />REMOVE COLLECTION` `f V <br />SIDE ACCESS I <br />ROAD <br />M N SCREENING BERM <br />3H:1V RECLAIMED SLOPE/ <br />Lilo RESERVOIR LINER <br />N � <br />a I� <br />I <br />I <br />I Z <br />I <br />ktJ <br />00 �� <br />qy 820 ,R <br />•%x �s '4�r .1.ii s <br />M <br />RECHARGE POND <br />J1 I <br />$ s <br />a <br />TRENCH & REPLACE 18' CULVERT <br />WITH FRENCH DRAIN &GATE <br />,t 1 <br />a"' (€ ; <br />e <br />a' t <br />it 1P 10� <br />X32 <br />szo ' � <br />WATERS U ' -S• <br />N4&, <br />BOX <br />WAII <br />F <br />_. DITCH <br />TOP OF LEVEE <br />4834' <br />af <br />M \ <br />d <br />O Cn <br />m, <br />18" CULVERT <br />& GATE <br />Qf k ,O) <br />3H:1V RESERVOIR <br />00 lj� <br />„t., LINER <br />RECHARGE POND <br />RE- ROUTED <br />BOX ELDER <br />DITCH <br />PERMIT — <br />BOUNDARY <br />bt <br />r <br />i <br />a <br />ac <br />Y <br />z <br />`5 <br />INN <br />OU <br />a <br />a <br />m <br />o <br />ro <br />ai <br />z <br />.► a <br />t <br />CL <br />i <br />i <br />`1 <br />a <br />a <br />t <br />2 9 <br />S <br />` <br />1° <br />u <br />a <br />a= <br />� <br />L9 <br />I <br />�z; <br />a <br />O O^ N CL <br />U <br />L <br />M N SCREENING BERM <br />3H:1V RECLAIMED SLOPE/ <br />Lilo RESERVOIR LINER <br />N � <br />a I� <br />I <br />I <br />I Z <br />I <br />ktJ <br />00 �� <br />qy 820 ,R <br />•%x �s '4�r .1.ii s <br />M <br />RECHARGE POND <br />J1 I <br />$ s <br />a <br />TRENCH & REPLACE 18' CULVERT <br />WITH FRENCH DRAIN &GATE <br />,t 1 <br />a"' (€ ; <br />e <br />a' t <br />it 1P 10� <br />X32 <br />szo ' � <br />WATERS U ' -S• <br />N4&, <br />BOX <br />WAII <br />F <br />_. DITCH <br />TOP OF LEVEE <br />4834' <br />af <br />M \ <br />d <br />O Cn <br />m, <br />18" CULVERT <br />& GATE <br />Qf k ,O) <br />3H:1V RESERVOIR <br />00 lj� <br />„t., LINER <br />RECHARGE POND <br />RE- ROUTED <br />BOX ELDER <br />DITCH <br />PERMIT — <br />BOUNDARY <br />bt <br />r <br />i <br />a <br />ac <br />Y <br />z <br />`5 <br />INN <br />OU <br />a <br />a <br />m <br />o <br />ro <br />ai <br />z <br />.► a <br />t <br />CL <br />i <br />i <br />`1 <br />a <br />a <br />w <br />2 9 <br />m <br />1° <br />M N SCREENING BERM <br />3H:1V RECLAIMED SLOPE/ <br />Lilo RESERVOIR LINER <br />N � <br />a I� <br />I <br />I <br />I Z <br />I <br />ktJ <br />00 �� <br />qy 820 ,R <br />•%x �s '4�r .1.ii s <br />M <br />RECHARGE POND <br />J1 I <br />$ s <br />a <br />TRENCH & REPLACE 18' CULVERT <br />WITH FRENCH DRAIN &GATE <br />,t 1 <br />a"' (€ ; <br />e <br />a' t <br />it 1P 10� <br />X32 <br />szo ' � <br />WATERS U ' -S• <br />N4&, <br />BOX <br />WAII <br />F <br />_. DITCH <br />TOP OF LEVEE <br />4834' <br />af <br />M \ <br />d <br />O Cn <br />m, <br />18" CULVERT <br />& GATE <br />Qf k ,O) <br />3H:1V RESERVOIR <br />00 lj� <br />„t., LINER <br />RECHARGE POND <br />RE- ROUTED <br />BOX ELDER <br />DITCH <br />PERMIT — <br />BOUNDARY <br />bt <br />r <br />i <br />a <br />ac <br />Y <br />z <br />M <br />INN <br />OU <br />a <br />a <br />m <br />o <br />ro <br />ai <br />z <br />.► a <br />v <br />CL <br />i <br />`1 <br />a <br />a <br />w <br />2 9 <br />m <br />1° <br />a= <br />� <br />L9 <br />I <br />�z; <br />a <br />O O^ N CL <br />U <br />L <br />F <br />O <br />U vNi o 5 <br />`o <br />117 <br />I- <br />In Z ......... <br />00 <br />W <br />0 cc <br />I' <br />TE <br />z l <br />Iq <br />1 <br />t I <br />r <br />; <br />@t <br />f <br />'SE CORNER <br />CTS <br />SE 3 <br />SEEDING <br />THINSPIKE WHEATGRASS (CRITANA) <br />SIDE -OATS GRAMMA (VAUGHN) <br />SWITCHGRASS (NEBR. 28) <br />SCARIFIED PRIOR TO THE <br />PLACEMENT OF FILL MATERIALS. <br />ALL WEATHERED BEDROCK TO <br />BE EXCAVATED AND REMOVED <br />FROM THE FOUNDATION. <br />WEATHERED BEDROCK SHALL <br />BE REMOVED UNTIL COMPETENT <br />BEDROCK (AS DETERMINED BY <br />THE ONSITE ENGINEER) IS <br />EXPOSED. <br />LEGEND: <br />EXISTING CONTOURS <br />- - EXISTING FLOWLINE <br />- EXISTING FENCELINE <br />SAMISTAWAIDUMM401 EXISTING PAVED ROADS <br />_ EXISTING DIRT ROADS <br />EXISTING VEGETATION <br />EXISTING UTILITY POLE <br />PROPERTY BOUNDARY <br />4820 PROPOSED CONTOURS <br />— 100 YEAR FLOODWAY <br />RE- ROUTED BOXELDER DITCH <br />PERMIT BOUNDARY <br />---- - - - - -- FRENCH DRAIN <br />LANDSCAPE NOTES: <br />51/2 #PLS /AC. <br />21/2 #PLS /AC. <br />11/2 #PLS /AC <br />41/2 #PLS /AC. TOTAL <br />ELEV. =4825 <br />3' FREEBOARD <br />SILTSTONE <br />BEDROCK <br />N.T.S. <br />W <br />C <br />Q) <br />0 4 <br />O; <br />AR <br />N <br />d <br />m <br />0 N <br />0 <br />E m o <br />m m - <br />y Z 0 Q <br />a —�° P o o w <br />aC) LL OOs <br />RECLAMATION NOTES: <br />1. SEEDING WILL BE ACCOMPLISHED BY DRILLING. <br />2. PLANTING WILL OCCUR IN THE FALL OR SPRING. <br />3. BERMS WILL AVERAGE 4 TO 5 FEET IN HEIGHT AND <br />40 TO 70 FEET IN WIDTH AS SHOWN ON THE PLAN. <br />4. LANDSCAPING ALONG SOUTH AND WEST BOUNDARIES <br />TO BE COMPLETED PRIOR TO PHASE 2 MINING. <br />H <br />J <br />EARTHWORK NOTES <br />1. Each layer of fill shall be scarified to allow 4. An 815 or 825 sheepsfoot roller will be <br />proper bonding between layers. used for compacting efforts. <br />2. Density and moisture content testing shall 5. The clay liner material shall be mixed in <br />be done at a rate of 1 test for each the embankment at the ratio of 4 parts <br />2000 yards placed. clay overburden (CL) to 1 part siltstone <br />bedrock. <br />3. All clay liner material shall be compacted <br />to a minimum 95% ASTM- D698 -78 Standard 6. The clay liner material shall be placed in <br />Proctor at ±2% of optimum moisture content. a 9" (max.) loose lift prior to compaction <br />GRADE <br />12.0' <br />FRENCH <br />DRAIN <br />UNDISTURBED <br />SAND & GRAVEL <br />:. <br />7. All bedrock material shall be ripped, moisture <br />treated, and allowed to air slake for a min- <br />imum of 1 day prior to its placement in <br />the liner. All bedrock material shall have <br />a minimum of 75% passing the #200 sieve <br />prior to placement in the embankment. <br />8. All random fill to be placed with a maximum <br />9" loose lift and compacted to a minimum <br />of 95% ASTM - D698 -78 Standard Proctor. <br />RECHARGE 3 _ 3 COMPACTED- <br />POND 1 CLAY LINER� 3 1 MINE <br />77 77 7 <br />Nei, , i� BEDROCK SURFACE TO BE SCARIFIED <br />PRIOR TO THE PLACEMENT OF FILL MATERIALS. <br />L 10.0' ALL WEATHERED BEDROCK TO BE EXCAVATED <br />AND REMOVED FROM THE FOUNDATION. <br />WEATHERED BEDROCK SHALL BE REMOVED <br />UNTIL COMPETENT BEDROCK (AS DETERMINED <br />BY THE ONSITE ENGINEER) IS EXPOSED. <br />FLOODWAY DIVERSION BERM CROSS SECTION <br />N.T.S. <br />FLOODWAY DIVERSION BERM NOTES <br />1. Berm location and alignment may be shifted north as needed without floodway impact. <br />2. Berm elevation may be higher than indicated if extra overburden materials are available. <br />3. Berm width may be wider than indicated without floodway impact if elevation is not above <br />existing ground to the south. <br />200 100 0 200 400 6010 <br />SCALE IN FEET <br />Z <br />e <br />o <br />4 <br />d o� <br />n <br />a <br />ac <br />Y <br />z <br />M <br />INN <br />OU <br />a <br />a <br />m <br />o <br />ro <br />ai <br />z <br />.► a <br />v <br />RECLAMATION NOTES: <br />1. SEEDING WILL BE ACCOMPLISHED BY DRILLING. <br />2. PLANTING WILL OCCUR IN THE FALL OR SPRING. <br />3. BERMS WILL AVERAGE 4 TO 5 FEET IN HEIGHT AND <br />40 TO 70 FEET IN WIDTH AS SHOWN ON THE PLAN. <br />4. LANDSCAPING ALONG SOUTH AND WEST BOUNDARIES <br />TO BE COMPLETED PRIOR TO PHASE 2 MINING. <br />H <br />J <br />EARTHWORK NOTES <br />1. Each layer of fill shall be scarified to allow 4. An 815 or 825 sheepsfoot roller will be <br />proper bonding between layers. used for compacting efforts. <br />2. Density and moisture content testing shall 5. The clay liner material shall be mixed in <br />be done at a rate of 1 test for each the embankment at the ratio of 4 parts <br />2000 yards placed. clay overburden (CL) to 1 part siltstone <br />bedrock. <br />3. All clay liner material shall be compacted <br />to a minimum 95% ASTM- D698 -78 Standard 6. The clay liner material shall be placed in <br />Proctor at ±2% of optimum moisture content. a 9" (max.) loose lift prior to compaction <br />GRADE <br />12.0' <br />FRENCH <br />DRAIN <br />UNDISTURBED <br />SAND & GRAVEL <br />:. <br />7. All bedrock material shall be ripped, moisture <br />treated, and allowed to air slake for a min- <br />imum of 1 day prior to its placement in <br />the liner. All bedrock material shall have <br />a minimum of 75% passing the #200 sieve <br />prior to placement in the embankment. <br />8. All random fill to be placed with a maximum <br />9" loose lift and compacted to a minimum <br />of 95% ASTM - D698 -78 Standard Proctor. <br />RECHARGE 3 _ 3 COMPACTED- <br />POND 1 CLAY LINER� 3 1 MINE <br />77 77 7 <br />Nei, , i� BEDROCK SURFACE TO BE SCARIFIED <br />PRIOR TO THE PLACEMENT OF FILL MATERIALS. <br />L 10.0' ALL WEATHERED BEDROCK TO BE EXCAVATED <br />AND REMOVED FROM THE FOUNDATION. <br />WEATHERED BEDROCK SHALL BE REMOVED <br />UNTIL COMPETENT BEDROCK (AS DETERMINED <br />BY THE ONSITE ENGINEER) IS EXPOSED. <br />FLOODWAY DIVERSION BERM CROSS SECTION <br />N.T.S. <br />FLOODWAY DIVERSION BERM NOTES <br />1. Berm location and alignment may be shifted north as needed without floodway impact. <br />2. Berm elevation may be higher than indicated if extra overburden materials are available. <br />3. Berm width may be wider than indicated without floodway impact if elevation is not above <br />existing ground to the south. <br />200 100 0 200 400 6010 <br />SCALE IN FEET <br />Z <br />P <br />am- <br />a <br />ac <br />gold)- <br />z <br />m <br />OU <br />a <br />m <br />o <br />C <br />C <br />z <br />v <br />CL <br />i <br />3 <br />a <br />a <br />w <br />2 9 <br />m <br />L9 <br />a <br />O O^ N CL <br />U <br />L <br />O <br />U vNi o 5 <br />`o <br />RECLAMATION NOTES: <br />1. SEEDING WILL BE ACCOMPLISHED BY DRILLING. <br />2. PLANTING WILL OCCUR IN THE FALL OR SPRING. <br />3. BERMS WILL AVERAGE 4 TO 5 FEET IN HEIGHT AND <br />40 TO 70 FEET IN WIDTH AS SHOWN ON THE PLAN. <br />4. LANDSCAPING ALONG SOUTH AND WEST BOUNDARIES <br />TO BE COMPLETED PRIOR TO PHASE 2 MINING. <br />H <br />J <br />EARTHWORK NOTES <br />1. Each layer of fill shall be scarified to allow 4. An 815 or 825 sheepsfoot roller will be <br />proper bonding between layers. used for compacting efforts. <br />2. Density and moisture content testing shall 5. The clay liner material shall be mixed in <br />be done at a rate of 1 test for each the embankment at the ratio of 4 parts <br />2000 yards placed. clay overburden (CL) to 1 part siltstone <br />bedrock. <br />3. All clay liner material shall be compacted <br />to a minimum 95% ASTM- D698 -78 Standard 6. The clay liner material shall be placed in <br />Proctor at ±2% of optimum moisture content. a 9" (max.) loose lift prior to compaction <br />GRADE <br />12.0' <br />FRENCH <br />DRAIN <br />UNDISTURBED <br />SAND & GRAVEL <br />:. <br />7. All bedrock material shall be ripped, moisture <br />treated, and allowed to air slake for a min- <br />imum of 1 day prior to its placement in <br />the liner. All bedrock material shall have <br />a minimum of 75% passing the #200 sieve <br />prior to placement in the embankment. <br />8. All random fill to be placed with a maximum <br />9" loose lift and compacted to a minimum <br />of 95% ASTM - D698 -78 Standard Proctor. <br />RECHARGE 3 _ 3 COMPACTED- <br />POND 1 CLAY LINER� 3 1 MINE <br />77 77 7 <br />Nei, , i� BEDROCK SURFACE TO BE SCARIFIED <br />PRIOR TO THE PLACEMENT OF FILL MATERIALS. <br />L 10.0' ALL WEATHERED BEDROCK TO BE EXCAVATED <br />AND REMOVED FROM THE FOUNDATION. <br />WEATHERED BEDROCK SHALL BE REMOVED <br />UNTIL COMPETENT BEDROCK (AS DETERMINED <br />BY THE ONSITE ENGINEER) IS EXPOSED. <br />FLOODWAY DIVERSION BERM CROSS SECTION <br />N.T.S. <br />FLOODWAY DIVERSION BERM NOTES <br />1. Berm location and alignment may be shifted north as needed without floodway impact. <br />2. Berm elevation may be higher than indicated if extra overburden materials are available. <br />3. Berm width may be wider than indicated without floodway impact if elevation is not above <br />existing ground to the south. <br />200 100 0 200 400 6010 <br />SCALE IN FEET <br />Z <br />P <br />am <br />J <br />a <br />ac <br />z <br />m <br />OU <br />a <br />m <br />o <br />C <br />C <br />z <br />J <br />LU <br />X <br />■ <br />Z � <br />N <br />a <br />W 'J <br />mi <br />^� W <br />Z <br />W V <br />OG = <br />J Q <br />W Z <br />Z G <br />V ~ <br />z <br />0 <br />a <br />U <br />N <br />W <br />0 <br />R. <br />w <br />Q <br />0 <br />LU <br />ir <br />0 <br />z <br />Date: 02/14/07 <br />Job No: 02 -191 <br />Drawn: CJC MAK <br />Design: KES WKS <br />Checked: <br />Scale: 1 " =200' <br />Sheet: <br />0 f: <br />