Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY RECEIVED <br />D <br />f N <br />l R <br />epaMlent o <br />atura <br />esources <br />t 313 sllerman st., Room zt 5 C O L D RA D O <br />Denver, Colorado 80203 APR 14 2005 D [VISION O F <br />Phone: 1303) 866-3567 RA L S <br />M I N E <br /> ~ <br />FAX: (3D3) 832.8106 Division of Minerals and GeolD <br />Btr G E O L O G Y <br />aECLANATION•NINING <br /> SAf ETY•ECIEN CE <br /> Bill Owens <br /> TRANSFER OF PERMIT AND SUCCESSION OF OPERATORS Gm'emor <br /> APPLICATION FORM Russell George <br /> ExeMive DlreRar <br /> Ronald W. CatGrw <br /> Diviuon Director <br /> Naturd Resourte Trustee <br />The application for a Transfer ofPernlit and Succession of Operators must contain fear (4) majorparfs: 1) an Application Fomo; 2) <br />an Application Fee; 3) a Perfotrnaace Warranty (attached as part of the Application Package) hearing the original notarized <br />signature of the Successor Operator, and, 4) a replacement Financial Warranty provided by the Successor Operator, beating an <br />original notazized signature. To expedite processing, please provide the inforalatioa in the format and order described below. <br />Permit #: M-1996-052 Confidential?: N <br />Class: Revision Type/Seq.: SO-1 <br />From: Ready Mined Concrete Company To: DMG <br />I. FINANCIAL TY INFORMATIt Doc. Name: SO Owens Brothers Concrete Company to Ready <br />Mined Concrete Company <br />q Date: 04/14/2005 <br />1.0 lion 1 e4 .I w'~ Speciahst: KLS <br />(Initial & Date) Divisi~ <br />~ f~ requirements. If you choose Option A you should not submit a Financial <br />~.,.(q~ Warranty and Performance Warranty until the Division notifies you of the <br />~~ correct amount of your warranty requirements." <br />2.Ootion B: ~(-~ 'j ~'~ s _ I DO NOT WISH TO WAIVE MY RIGHT to a 30-day processing time. I <br />(Initial & Date) hereby submit a replacement Financial Warranty for the same dollar amount <br />as the Financial Wamaty maintained by the currem operator. I understand <br />drat the Division of Minerals and Geology will recalculate d1e required <br />reclamation bow within b0-days from the date that the traffifer is completed <br />and the required FINANCIAL WARRANTY COULD BE <br />SUBSTANTIALLY INCREASED at that time. Asthenewoperator,Iagree <br />to be responsible for posting any required increase to the financial warranty <br />for good cause showq in a fomt acceptable to the Board, within 60.days of <br />such notice. <br />Office of Office of Coloado <br />Mined Land Reclamation Attive and Inactive Mines Geological Survey <br />