My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE31351
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE31351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:00 PM
Creation date
11/21/2007 12:57:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Enforcement
Doc Date
5/30/2002
Doc Name
Signed Settlement Agreement
From
Lorencito Coal Company
To
DMG
Violation No.
CV2002002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pF'p0~ <br />~~' <br />•~ <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />33]3 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />SETTLEMENT AGREEMENT ~~~~f`VE® <br />NOV/CO NO.: CV-2002-002 MAY 3 0 <br />2001 <br />MINE: Lorencito Canyon Mine <br />PERMIT NO.: C-1996-084 <br />OPERATOR/PERMITTEE: <br />Lorencito Coal Company, LLC <br />ATTENTION: Bruce Addington <br />ADDRESS: 20500 Highway 12 <br />Weston, CO 81041 <br />Division of i erals and Geology <br />DATE ISSUED: February 13, 20~~ <br />TYPE OF MINE: Surface/Non-Federal <br />COUNTY: Las Animas <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount of Civil <br />Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as required by law, on April 9, 2002, the Division and the operator hereby <br />agree as follows: <br />1. The amount of the penalty shall be $2,050.00; <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from <br />the date this Agreement is signed by all parties; <br />3. Payment of such penalty by the operator shall constitute a waiver of all further rights <br />to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is set forth below opposite the signature of the Conference Officer. <br />If not signed within ten days, the Division will fix the penalty at whatever amount it deems appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />34-33-123(8)(a). <br />OPERATOR: Lo/L Er~c~;b <br />By ~D` M~~ <br />DNISI OF MI~NjER~ALS D GEOLOGY: <br />By .~ ~G~cl (/- <br />Conference Officer <br />By <br />Division Director <br />DATE: ~-/~~OZ <br />DATE: / Q Zi <br />Penalty Adjustment Reviewed <br />[Rule 5.04.3(4)(c)] <br />CRS 34-33-123(8)(c) and (d) <br />C-NV-0iA CIY960X~ KAG 2003P116_I15715 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.