My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE31093
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE31093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:42:53 PM
Creation date
11/21/2007 12:52:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Enforcement
Doc Date
6/5/1995
Doc Name
RATON CREEK MINE SITE SEEDING PROJECT STATUS RATON CREEK MINE PN C-82-055
From
ENERGY FUELS MINING CO
To
DMG
Violation No.
CV1995018
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiuiiiiii <br />energy fuels mining company <br />one labor center • style 2500 <br />1200 seventeenth street • denver, Colorado 60202 <br />May 30, 1995 <br />Ms. Janet H. Binns <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE: Raton Creek Mine Site Seeding -Project Status <br />Raton Creek Mine, Permit No. C-82-055 <br />Deaz Janet: <br />(3031623-8317 <br />Avx 910.931-2561 <br />RECEIVED <br />JUN 0 5 1,995 <br />Division of Minerals s neology <br />This letter summarizes our phone conversation, on the above date, regazding EFMC's seeding of the <br />Raton Creek Mine Site. As you know, we have been poised to start seeding the site and have been <br />delayed by weather conditions throughout May, and by the recent earthwork involving removal of the <br />catch basins. Along with the catch basin removal we have recently regraded portions of the south <br />slope of the refuse pile and the upper substation pad azea in response to issues resulting from the <br />Phase I inspection. <br />Items we discussed aze summarized below. <br />o Due to the late season, EFMC will incorporate oat seed with the approved seed mix to <br />provide a cover crop. The oat seed will applied at a rate of approximately 10 lbs. per acre. <br />The oats should provide erosion control and contribute organic matter to the soil at the end of <br />the first growing season. <br />The center of the original facilities azea, or "flat azea", has been partially re-worked during <br />the catch basin removal project. During seeding, this azea will be disced similaz to the <br />surrounding azeas, and mulched. <br />Weather permitting, we will initiate seeding at the end of this week or beginning of next. Please <br />contact me if you have any questions or concerns regazding our pending plans. <br />Sincerely, <br />Energy Fuels Mining Company <br />C <br />Allen S. Weaver <br />Mine Engineer <br />cc: Randy Acre (EFMC) <br />
The URL can be used to link to this page
Your browser does not support the video tag.