Laserfiche WebLink
<br />l III IIIIIIIIIIIII III <br />sss <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />Ill 1 Sherman 51.. Room 215 <br /> <br />Denver. Colorado 80203 ~ii~~ <br /> <br />Phone. (3071 866-3567 II <br />FA%: (3011 8 3 2-81 06 <br /> DEPARTMENT OF <br />May 15, 1995 NATURAL <br /> RESOURCES <br />G. Lowell Moran Roy Romer <br /> <br />Walden, CO 80480 Governor <br /> lames s E«hhead <br /> 6ecmwe Dnector <br />RE: 720 Pit Area, Michael B. Long <br />Continued Phase I Bond Release Inspection, Division Dnec~nr <br />Kerr Coal Company, Marr Mine, Permit No. C-80-006. <br />Dear G. Lowell Moran: <br />This notice is to announce the continuation of the Phase I bond release inspection from <br />5/12/94. Individuals present during the 5/12/94 inspection included: <br />Stephen Rathbun Dept. of Interior, Office of Surface Mining; <br />Henry Austin Dept. of Interior, Office of Surface Mining; <br />Jim Perry <br />Randy Price <br />David Berry <br />Bobbie Mobley <br />Josephine Calkins <br />John Wilkes III <br />Jerry Nettleton <br />George Patterson <br />Dept. of Interior, Bureau of Land Management; <br />Colorado Division of Minerals and Geology; <br />Colorado Division of Minerals and Geology; <br />Colorado State Land Board; <br />Colorado State Land Board; <br />Colorado State Land Board; <br />TerraMatrix; and <br />Kerr Coal Company, Marr Strip Mine. <br />The 5/12/94 inspection focused on backfilling, regrading, and drainage control for the <br />720 Pit and Pit 1 areas. Comments raised by the Colorado Division of Minerals and <br />Geology (DMG) inspectors, have been addressed through technical revision to the <br />mining and reclamation plan (TR-12). Office of Surface Mining (OSM) inspectors, <br />present at that inspection, have argued that Pit 1 reclamation did not satisfy <br />"approximate original contour' requirements. OSM concerns have been satisfied through <br />technical revision (TR-13). Kerr Coal Company anticipates that field implementation of <br />the plans approved through TR-13, will not be completed until the fall season of 1995. <br />As such, Kerr Coal Company has modified their original Phase I request to include only <br />the 720 Pit area. Specifically excluded from the current Phase I bond release request are <br />the areas previously referred to as "pre-law" reclamation Marr Strip, the office and <br />facilities area, the Tipple loadout, and Pit 1. <br />