Laserfiche WebLink
iii iiiiiiiiiiiu iii <br />999 <br />CHRONOLOGY OF EVENTS <br />I ~.NOV C-96-0051 <br />February 20, 1996 Walter level in Gulch A Pond 1" below primary riser pipe <br />February 21, 1996 Manual gate opened by operator <br />February 22, 1996 Wal er sample collected by operator <br />i <br />February 28, 1996 1st meeting between Colowyo, DMG and WQCD regarding <br /> sediment ponds <br />February 29, 1996 Manual gate closed by operator <br />March 1, 1996 Operator reported notice of noncompliance to Water Qualiry <br /> Control Division; <br /> Settable Solids- 580 mg/1 <br /> 'T'otal Suspended Solids- 14,900 mg/1 <br /> I Iron- 249 mg/1 <br />I <br />March 6, 1996 Opierator notified DMG regarding noncompliance discharge <br />March 19, 1996 DMG inspection; confirmed dates noted above regarding <br /> operation of Gulch A Pond <br /> <br />March 20, 1996 i <br />NOV C-96-005 issued <br />March 25, 1996 Step 1 abated (repair eastside collection ditch) <br /> <br />March 26, 1996 I <br />NOV modified to correct rules cited <br />March 27, 1996 2nd meeting between Colowyo, DMG and WQCD <br />April 20, 1996 Step 2 abated (submit revision demonstrating Gulch A Pond is <br /> in compliance with Rules) <br /> Comments from operator regarding NOV <br /> <br />April 26, 1996 I <br />3rd meeting between Colowyo, DMG and WQCD <br /> Civil Penalty assessed by DMG <br /> <br />May 10, 1996 I <br />NOV terminated <br />I <br />