Laserfiche WebLink
• • iii iiiiiiiiuiii iii <br />UPDATE ON CORRECTIVE ACTION PLAN <br />SNYDER QUARRY <br />PRESENTED TO CMLRB JUNE 27, 1990 <br />WORK THAT WAS TO BE DONE IN CORRECTIVE ACTION: <br />1. WILLIAMS CANYON: <br />a. Reseed disturbances by November 1, 1990. <br />b. Plant trees by June 1, 1990. <br />c. Monitor success of plantings. <br />d. Report results of monitoring program in annual reports. <br />2. ROAD SIDE DAMAGES: <br />a. Regrade roadside disturbances in accordance with plans. <br />b. Reseed disturbances by November 1, 1990. <br />c. Plant trees by June 1, 1990. <br />d. Monitor success of plantings. <br />e. Report results of monitoring program in annual reports. <br />3. SILT RETENTION FACILITY: <br />a. Submit plans 60 days prior to construction. <br />b. Construct after approval. (No specified date for completion, <br />but assumed as being as soon as possible.) <br />4. CULVERTS: <br />a. Install culverts as per plans. <br />~i b. Submit as-built drawings of culverts within 60 days after <br />construction. <br />c. Resolve dispute over HR6 by March 31, 1990. <br />5. ROCKFALL HAZARD: <br />a. Take measures to insure that no offsite impacts due to rockfall <br />or flyrock occurs. <br />R~~~EIVED <br />.JUN 27199' <br />NIINED LANG <br />RECI_AIuIATION DIV~~~^~] <br />Page 1 of 7 SNYDER CAP UPDATE 6-27-90 <br />