Laserfiche WebLink
iii iiiiiiiiniiiiii <br />999 <br />Page 60 <br />Construction Materials Rule 3 <br />(f) a general engineering plan stating how the material will be <br />placed and stabilized in a manner to avoid unacceptable settling and voids. <br />n6(a)(c) (10) All mined material to be disposed of within the affected area must be <br />handled in such a manner so as to prevent any unauthorized release of pollutants to <br />the surface drainage system. <br />t t6(s)(d) (11) No unauthorized release of pollutants to groundwater shall occur from <br />any materials mined, handled or disposed of within the permit azea. <br />3.1.6 Water -General Requirements <br />116(4)(h) <br /> <br />(b) compliance with applicable federal and Colorado water <br />quality laws and regulations, including statewide water quality standazds and <br />site-specific classifications and standazds adopted by the Water Quality <br />Control Commission; <br />(c) compliance with applicable federal and Colorado dredge and <br />fill requirements; and <br />(d) removing temporary or lazge siltation structures from <br />drainways after disturbed azeas aze revegetated and stabilized, if required by <br />the Reclamation Plan. <br />116(4)(b) (2) Earth dams, if necessary to impound water, may be constructed if the <br />formation of such impoundments will not damage adjoining property or conflict with <br />water pollution laws, rules or regulations of the federal govemment, the state of <br />Colorado or with any local govemment pollution ordinances. <br />~~,. <br />r <br />~._ <br />~\ <br />