Laserfiche WebLink
~v V ~~~~ ~ :III IIIIIIIIIIIII • <br />PERMITT..., ___ sss III ,N <br />Presentation Form <br />General Information: SNOWSTORM PLACER <br />Date: 2-21-96 Specialist: Gary Curtiss <br />File No.: M-83-084 Acreage: 260 <br />Operator: Zigan Sand & Gravel Commodity: Gold <br />Location: Park County <br />Existing Bond: $72,818.00 Certificate of Deposit <br />New bond calculations performed on 11-1-95 and <br />sent to the operator on 11-17-95 indicate that <br />this bond amount is not sufficient. Bond re- <br />calculated at $175,815.00. <br />Nature and Duration of Violation: <br />11-15-90 Amendment 001 approved. Phased mining plan and <br />concurrent reclamation to include backfillinq the pit <br />with sediment pond tailings. Maximum pit disturbance <br />allowed = 6 acres at any one time. <br />3-27-91 Board conditionally approved Amendment 002. <br />Mining plan revised to reduce the maximum pit <br />disturbance to 2.1 acres. This was done to reduce the <br />required financial warranty amount. Reclamation <br />concurrent with mining by backfillinq, replacing topsoil <br />and reseeding. The maximum size of the active pit was <br />revised to 2.1 acres with the bond amount based on this <br />maximum pit size. <br />4-3-95 Permit transferred to Zigan Sand & Gravel Inc. <br />9-28-95 DMG inspection: <br />Possible Violation- Failure to follow reclamation plan: <br />Active pit exceeds maximum size and concurrent <br />reclamation not being conducted. <br />Corrective Action - By 12-12-95 either backfill pit to <br />2.1 acres or submit revision which includes revised <br />mining and reclamation plans and bond re-calculation. <br />11-17-95 DMG notified the operator that the bond had been <br />recalculated for all mining related disturbance to <br />$175,815.00. Operator given to 1-16-96 to submit <br />required bond amount. <br />12-22-95 Operator's response to 9-28-95 inspection report. Plans <br />to submit plan to increase the area of severe <br />disturbance but needs more time. <br />12-26-95 DMG inspection: <br />No changes on-site regarding reduction of active pit to <br />maximum allowable size of 2.1 acres. DMG had not <br />received a revision to the permit. Corrective Action <br />dates for backfillinq pit or submitting an amendment <br />extended to 4-30-96 (returned unclaimed on 3-4-96). <br />