Laserfiche WebLink
• <br />BATTLE MOUNTAIN GOLD <br />August 21, 1995 <br />iii iiiiiiiiiiiiiiii • <br />Y <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />4FCEIVEL~ <br />AUG 2 4 1995 <br />Division of minerais ~ GeolDgy~,,,,1 <br />GOLD COMPgNY <br />-G. <br />Re: Battle Mountain Resources, Inc. - San Luis ~ ~ <br />DMG Permit No. M-88-112 <br />Dear Mr. Dillie: <br />This letter is in partial response to your letter dated <br />August 11, 1995 which outlined the status of a few <br />outstanding issues. One of those issues was that BMRI had <br />not been able to get a depth to water measurement on w@11 M- <br />14 since March 13, 1995. The melted portion of the PVC pipe <br />has been replaced and depth to water measurements were begun <br />again during the August biweekly water sampling period. <br />Sincerely, <br />Sally ayes <br />Environmental Engineer <br />cc: Anne Baldrige <br />Dan Robertson <br />P.O. BOX 310 SAN LUIS, CO 81152-0310 (719)672-3362 EXT. 39 FAX (719) 672-3363 <br />