My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE27579
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE27579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:09 PM
Creation date
11/21/2007 11:39:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Enforcement
Doc Date
10/29/1990
Doc Name
NOVS C-90-035 AND C-90-036
From
PEABODY COAL COMPANY
To
MLRD
Violation No.
CV1990036
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~b~dy <br />:~ <br />PEABODY COALCOMPANY <br />Western Dlvlsion <br />IIIIIIIiiililllllll <br />_ ~ - - "~~'~~ 1300 Sautft Vale <br />~ ~ ~:,: :: ~. ~:'-;; _~:i'. '~ -, ;,, .,, Fla9slafl. Ar¢ona 96001 <br />(602) 774.5253 <br />October 29, 1990 <br />Mr. Carl Mount <br />Colorado Mined Land Reclamation Div. <br />1313 Sherman Street Room 215 <br />Denver, Colorado 80203 <br />RE: NOV's C-90-0's5 and C-90-036 <br />Dear Mr. Mount: <br />Violation C-90-035, issued for failure to <br />stabilize topsoil stockpiles 8 and 13, required <br />a stabilization plan be submitted by September <br />14, 1990. The requited plan was submitted to the <br />Division on September 13 and 26, 1990. The <br />sediment control for stockpile 8 consisted of <br />placement of straw bales as a catchment. This <br />activity was completed on September 6, 1990. The <br />construction of a catchment ditch and basin on <br />stockpile 13 was requited Co be completed by <br />October 31, 1990. Both stockpiles were required <br />to be seeded by October 31, 1990. All of the <br />abatement work on those two stockpiles was <br />completed on October 26, 1990. The catchment <br />basin for topsoil stockpile 13 was designed to be <br />a minimum dimension of 10 feet wide by 75 feet <br />long, with a 3 foot high berm. Due to field <br />conditions, two catchments were actually <br />constructed, each with a dimension of 10' x 40' <br />x 3', exceeding the design specifications. Both <br />stockpiles were seeded and mulched. <br />Violation C-90-036, issued for failure to <br />vegetate and stabilize side slopes of ponds 002, <br />004, and 005, required stabilization by October <br />31, 1990. Minor Revision No. 12 was submitted to <br />the Division on September 26, 1990 to address <br />remedial actions for pond slopes. In accordance <br />with the approved MR 12, all remediation action <br />on pond slopes was completed on October 26, 1990. <br />
The URL can be used to link to this page
Your browser does not support the video tag.