My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE27327
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE27327
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:59 PM
Creation date
11/21/2007 11:34:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Enforcement
Doc Date
7/9/1991
Doc Name
MEMO ANTICIPATED LEGAL ISSUES FY91/92
From
MLRD
To
FRANK JOHNSON
Violation No.
CV0000000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />III III III III IIII III <br />999 <br />STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />7373 Sherman St.. Room 275 <br />Denver. CO 80203 <br />303 866.3567 <br />FA X: 303 632.8706 <br />July 9, 1991 <br />MEMO <br />To: Frank Johnson, Dave Berry, Larry Routten <br />From: Steve Renner <br />Re: Anticipated legal Issues, FY91/92 <br />of ~o~ <br />Nom; ,4~ <br />.,~8 <br />~ re]6 ~ <br />Ror Romer. <br />Goverror <br />Fred R. Banta. <br />Division Director <br />The legal issues which the coal staff anticipates will require attorney general <br />input during FY 91/92 are summarized below in order of decreasing priority. We <br />are currently allocated 780 hours of Attorney General time. I think that this <br />is a marginal allotment. Therefore, time needs to be budgeted carefully. <br />Please see my Memo of June 13, 1991 for the AG referral procedures. <br />1) Carbon Junction- Continue to monitor bankruptcy hearings in Texas; continue <br />to pursue terms of June, 1991 joint motion. <br />2) La Plata- Need to resolve conveyor status. Need to have bank install <br />sediment control system. Possible bond revocation. <br />3) Mid-Continent- Need to pursue permit revocation and bond forfeiture at the <br />January, 1992 Board meeting if terms of the settlement agreement are not met. <br />Meet in mid November to discuss. <br />4) Southfield/GEC- Need to draft a settlement agreement between Southfield, GEC <br />and the Division as soon as the Southfield tr technical issues are resolved. <br />Anticipate a late August completion. <br />5) Fruits- No permit at this site, but we hold a bond. We will probably <br />forfeit the bond at the Sept. or Oct. Board meeting. Possible settlement, but <br />highly unlikely. <br />rf <br />6) Rulemaking- Anticipate the need to review proposed 181 rules and other rules <br />proposed as a result of 1989 733 letter from OSM. <br />r~) Trinidad Basin- Revocation hearing was continued until the July Board <br />meeting. Anticipate minimal involvement. <br />8) Blue Flame- Poeaibly a request for judicial-review. If not, then probably <br />no involvement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.