Laserfiche WebLink
r <br /> <br />BATTLE MOUNTAIN GOLD <br />March 1, 1993 <br />~) I I I~ (I~ I I~ ~I~~ ~I~ <br />sss <br />PANY <br />iv <br />5 ~gg3 <br />PR <br />~~X/yy~,~~.r. ~ <br />3- z -ice <br />s 3 •rs k ~ w.,, ~ ~~ <br />~71L,~~~~ ~1,.:.7.-1 <br />Gl u.~ ~ <br />DivisionyofeMinerals and Geology ~ ~aeseydt'~~~o9n <br />1313 Sherman Street, Room 215 1p~u~" ~:_ <br />Denver, Colorado 80203 ~~~'' BAiTLE MOUNWN <br />COED COMPANY <br />Re: Battle Mountain Resources, Inc. (BMRI) - San Luis <br />DMG Permit No. M-88-112 <br />Changes to QA/QC Protocol Manual <br />Dear Mr. Oehler: <br />During the February 19, 1993 meeting between DMG, BMRI, and <br />RCG/Hagler, Bailly, Inc., various changes to the sampling <br />protocol were discussed. The following modifications to the <br />approved TR-006 document, QA/QC Protocols for the Collection <br />of Surface and Ground Water Quality Data, October 1992, will <br />be implemented during the bi-weekly sampling event for the <br />week of March 1. <br />1) A clean filter paper will be placed in the barrel filter <br />when a barrel filter rinse blank is being collected. <br />Sections 2.2, 3.2, and 4.2.7 of the QA/QC manual will be <br />modified. <br />2) Temperature, pH, specific conductivity, and dissolved <br />oxygen readings will be taken in the field for each o$ the <br />process samples. Also, a separate listing of analytical <br />parameters for the process points will be included in the <br />manual. Section 4.2.6 of the QA/QC manual will be modified. <br />3) All field notes will be taken in permanent ink and <br />entered into a bound notebook with numbered pages. Sections <br />2.1.2, 2.2.3, 2.2.7, 2.4, 3.2.3, 3.4, 4.2.3, 4.3, and <br />Appendix B will be modified. <br />4) All preserved samples will be checked with pH paper to <br />verify proper pH before shipment to the analytical lab. <br />Sections 2.1.5, 3.2.2, and 4.2.2 will be modified. <br />5) The following sampling procedures were discussed during <br />our meeting. These procedures are currently specified in <br />the approved protocol. As discussed, BMRI will follow the <br />procedures outlined below: <br />- Final de-ionized water from the BMRI lab will be used for <br />equipment rinsing. <br />- The field parameters instrument will be calibrated after <br />3-5 samples are collected and after collection of a sample <br />that differs significantly from the following sample. <br />- The field instrument automatically indicates when a Single <br />reading has stabilized. The stability for each field <br />parameter will be reached before sampling. <br />P.O. BOX 310 SAN LUIS, COLORADO 81152-0310 (719) 672-3362 FAX (719) 672-3363 <br />