Laserfiche WebLink
J. ~. STOVER & ASSOCI~ES <br />2768 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PNONE: (303) 245-4101, FAR 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />March 29, 1993 <br />III IIIIIIIIIIIIIIII <br />999 <br />CIVIL ENGINEERING <br />CONSTRUCTION MANAGEMENT <br />RECEIVED <br />S. S. Shuey __._ <br />Division of Minerals and Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />MAR 31 1993 <br />Division of Mmerais a Geology <br />Re: Somerset Mining Company <br />TR-011 - Gob Pile Expansion <br />Permit C-81-022 <br />Dear Mr. Shuey: <br />Please extend the decision deadline for TR-11 until April 30, 1993. <br />We should be able to submit the required stability study to the <br />Division by April 7th. The Division will need the remainder of the <br />month to review the study. <br />Sincerely, <br />Jim Stover, P.E. <br />Consulting Engineer <br />cc: Basil Bear <br />