Laserfiche WebLink
INTEROFFICE MEMORANDUM <br />TO: llAN <br />FROM: JAN13'I' NINNS~ V ' <br />SUBJECT: '1'Rr\PVI?R 11 E, 0198 -010, <br />DATE: 5/12/2006 _ <br />Dan, I have prepared a draft findings document for Trapper Mine, SL-07, Phase III bond release. I have <br />checked the finding over several times, and hopefully, have corrected any errors. Please find a copy of my <br />Draft findings document for your review. Included are revised reclamation cost pages documenting tasks to <br />be removed from the Trapper reclamation cost estimate for tasks released by SL07. Also included are <br />summary forms from the Trapper "remaining" reclamation cost estimate removing those tasks from the <br />overall remaining estimate. Since the TR96 estimate was the most current estimate, the summary form <br />reflects TR96 estimate summary subtracting out SL071iability release tasks. <br />Current bond liability as reflected in database after approval of TR96 = $17,830,595.00 <br />Reclamation costs associated with tasks released by SL07= $371,146.00 <br />Reclamation liability after SL07 approval = $17,830,595.00 - $371,146.00 = $17,493,018.00 <br />Actual Bond held by DMG = $18,500,000.00 <br />Monetary amount requested for release by operator with SL07 = $38,181.00 <br />Remaining Bond amount retained by DMG after SL07= $18,500,000.00 - $38,181.00 = $18,461,819.00. <br />I believe this should document remaining required liability adequately. <br /> <br />