My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV17564
DRMS
>
Back File Migration
>
Revision
>
REV17564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:29:14 AM
Creation date
11/21/2007 11:26:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
7/19/1993
Doc Name
BEAR COAL MINE 3 FN C-81-038 TR 15 ADEQUACY REVIEW
From
DMG
To
BEAR COAL CO
Type & Sequence
TR15
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />. <br /> <br />STATE OF ~iiiiiiiiiiiiiiuiii <br />999 <br />COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />OF'C0~ <br />Depanmenl of Natural Resources ~~ <br />4 <br /> ` ~ t' <br />1313 Sherman Sl., Room 215 ~ <br />O <br />• ~ <br />Denver, CO 80203 • ~ <br />Phone: (3031 866-3567 reT6 <br />FAX:1303) 832-8106 <br /> Roy Ramer <br />July 19, 1993 Governor <br /> Michael B. Long <br />Mr. Basll Bear Division Dneclor <br />Bear Coal Company <br />P.O. $ox 518 <br />Somerset, CO 81434 ~- <br />RE: Bear Coal Mine No. 3, File C-81-038, TR-15, Adequacy Review <br />Dear Mr. Bear: <br />The Division has conducted an adequacy review of your submittal of revised pond <br />no. 4 designs. This submittal was part one of a two part abatement requirement <br />for Notice of Violation C-93-075. The submittal is classified as <br />Technical Revision No. 15 and the Division's adequacy comments to TR-15 are as <br />follows: <br />Division Adequacy Comments <br />No. Comment <br />1. Please illustrate, on Drawing 11-3, the gate valve located on the <br /> in-pond side of the primary spillway and indicate that the full <br /> water level on the same drawing is with the gate valve closed. <br />2. Please indicate, on Drawing 11-3, the slope of the primary spillway <br /> and the sl es of the and embankment inslo es and outdo es. <br />3. Please clarify what the "gap" indicates in the Water Level in <br /> Pond/Sediment Pond Stage Filling Diagram, illustrated on <br /> Drawing 11-3. <br />4. Please discuss Bear Coal Co.'s plan to dewater the pond in a timely <br /> manner, such that the required storage volume reasonably assured. <br /> <br />if you have any questions, please contact me. <br />Sincerely, <br />~i4 "'~ <br />Steve 'S. Shuey <br />Reclamation Specialist <br />SSS/ern <br />cc: Jim Stover <br />M:\oss\ern\basil.sss <br />
The URL can be used to link to this page
Your browser does not support the video tag.