My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE26663
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE26663
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:31 PM
Creation date
11/21/2007 11:22:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Enforcement
Doc Date
3/4/1998
Doc Name
INSPECTION FOLLOW UP GOB PILE BOWIE 2 MINE PN C-96-083 BOWIE RESOURCES LIMITED
From
DMG
To
BOWIE RESOURCES LIMITED
Violation No.
CV1999004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiniu iii <br />999 <br />STATE OF CULOIZADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Uepanmem n! Natural Resources <br />I I 1 1 Sherman 81., Room ! I S <br />prover, Colorado fl0207 <br />Phnnc~ 1)031 855-7557 <br />FAX' 1)011 83!-8105 <br />March 4, 1998 <br />Mr. William A. Bear Jr. <br />Bowie Resources Limited <br />Bowie No. 2 Mine <br />P.O. Box 483 <br />Paonia, Colorado 81428 <br />~~~ <br />DEPARTNIENi O <br />NATURAI <br />RESOURCE: <br />Rov Romer <br />Gave.nw <br />tames 5. lnchhead <br />E.ecwive D~reaor <br />hechael 8. Long <br />Division Dvecmr <br />RE: Inspection Follow up, Gob Pile, Bowie No. 2 Mine, Permit No. C-96-083, Bowie <br />Resources Limited. <br />Dear Mr. Bear: <br />During the Division's February 24, 1998 field inspection of the gob pile at the Bowie No. <br />2 Mine, several issues were raised concerning the construction of the pile. After <br />consultation at the office, the Division wishes to discuss these concerns. <br />First, during the inspection, the operator had stated that the coal waste material that had <br />already been placed at the gob pile has had a higher than desired moisture content, and <br />that this has been the case since the beginning of coal waste disposal. Again, according to <br />the operator, initially, only subsoil material from the gob pile area was being added to the <br />coal waste, to decrease the moisture percentage. Later on, drier coal waste material also <br />was being added to the coal waste material before it was brought to the gob pile. During <br />the February field inspection, it was observed that the most recent lift was being prepared <br />with the addition of subsoil material and with a drier coal waste material. The Division <br />has three concerns: <br />The Division would like to know the source of the moisture in the coal waste. Is it <br />from mine water seepage within the mine or is it from exposure [o meltins <br />snowfall or rain due to the storage of the coal waste on the portal bench? <br />The Division believes that the higher than anticipated moisture content in the coal <br />mine waste and the addition of subsoil material to the coal mine waste may have <br />
The URL can be used to link to this page
Your browser does not support the video tag.