Laserfiche WebLink
~ ~ III IIIIIIIIIIIII III <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />IL•pdrllnonl of Ndlu r,il Rrwun cc <br />III 4 \hcnn.m til . Knum ? 15 <br />Urnvcr. ( ulaiddn ri11201 <br />I'hunr X1041 IILL 451r7 <br />I :~~ Itu it +l u.nl w, <br />January 31, 1996 <br />Mr. Dave Hammer <br />DH Holding, Inc. <br />401 Clayton Road <br />P .O. Box 735 <br />Silverton, CO 80498 <br />RE: Continuance of Board Hearing, Tower Pit, Permit H-77-436. <br />Dear Mr. Hammer: <br />I~~I~ <br />I )EPARTMENT OF <br />NATURAL <br />FZESOURCES <br />Ruy Rnmrr <br />I,n~rrnn~ <br />lan,ev 1 Iw hhnad <br />E.ri W rvr Unrr for <br />htn hurl li Lunp <br />o . ~.~nn I )nn, .n. <br />On January 26, 1996, the Mined Land Reclamation Board continued the Formal Public <br />Hearing consideration of possible notice of violation of C.R.S. 34-32-117(4)(b)and <br />(c) for failure to maintain sufficient financial warranty until the February 21-22, <br />1996 meeting. The continuance was granted because sufficient financial warranty was <br />posted before the meeting if the technical revision now under consideration was <br />completed in the near future. <br />The hearing will be held in Room 318 of 1313 Sherman Street, Denver, Colorado, <br />beginning at 9:00 A.M. or as soon thereafter as the matter can be considered. At <br />that hearing you will have the opportunity to be represented and heard. It will be <br />reiterated that there ie reason to believe that you are in violation of the <br />provisions noted above. <br />If the Board finds a violation at this hearing, it may issue a Cease and Desist <br />Order, assess a Civil Penalty in the amount of $100.00 to $1,000.00 for each day of <br />violation or order the permit be suspended, modified or revoked. In addition, it <br />may set the matter for consideration of forfeiture of the $45,000.00 financial <br />warranty. If you have evidence indicating that the possible violation noted above <br />does not exist or has been corrected, please provide it to ue ae soon as possible <br />or bring it to the hearing. <br />To avoid thin hearing, the technical revision must ba completed or additional <br />financial warranty of $9,200.00 must be posted by February 20, 1996. <br />If you have any questions, please contact me. <br />Sincerely, <br />~,. ~ ~ it <br />Carl B. Mount <br />Senior Environmental Protection Specialist <br />C:M77436BF.LET <br />