Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />Memorandum <br />To: Tom Kaldenbac~~~ <br />From: Janet Binns ~ /) <br />Date: 6/14/01 v <br />Re: Foidel Creek Mine, C-82-056, TR-38 <br />File: C:/jhb/C82056lTR-38 TAK.doc <br />TROI-38 was submitted by Twentymile Coal Company as part of the abatement required for NOV-CV- <br />2001-004. Originally, during the transition between you and I switching mine assignments, we had <br />discussed that Kent would look this revision over, then when he had his adequacy concems together, the <br />three of us would sit down and figure out who would take lead on this one. Kent indicated that he has had a <br />chance to review the revision and has adequacy concems to forward to the operator. I have not seen his <br />adequacy letter yet. But, now is the time to decide who will take leads on this one. We need to get our <br />adequacy letter out to TCC pretty quick. What do you think? I'll be out of the office from 6/18-7/2. <br />I'll pick up my voice mail from the field if you want to send me voicemail. Thanks <br />