My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV16141
DRMS
>
Back File Migration
>
Revision
>
REV16141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:27:32 AM
Creation date
11/21/2007 11:11:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
12/21/1995
Doc Name
BEAR COAL CO FN C-81-033 TR 23
From
DMG
To
J E STOVER AND ASSOCIATES
Type & Sequence
TR23
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiii iii <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depart menl of Nalu ral Resources <br />1 } 1 } Sherman 51., Room 215 +yk <br /> <br />Denver, Colorado P0207 I <br />~ <br />` <br />Phone: 1303) 866 1567 III <br />FA% U031 812-810L <br /> DEPARTMENT OF <br />NATURAL <br />December 21, 1995 RESOURCES <br />Roy Romer <br />J.E. Stover and Associates cnremnr <br />Attn: Jim Stover Tames S. Lochhead <br />2768 Compass Drive, $ulte 101 E.ecm rve Dnecro~ <br />Grand Junction, Colorado 81506 Michael B. Lung <br />Derision Direcbr <br />RE: Bear Coal Company; File No. C-81-033; Technical Revision 23 <br />Dear Mr. Stover: <br />The Division has conducted a preliminary adequacy review for <br />technical revision 23 which was submitted to update the hydrologic <br />monitoring plan. As we discussed, there are a couple of minor <br />changes being requested which are listed below. <br />1. The Bear No. 3 Mine water monitoring location map that was <br />submitted with some of the Annual Hydrology Report responses <br />should be incorporated into the body of the permit document. <br />This could possibly be done on page 2.04-30t or u, which is <br />shown as 'intentionally left blank' in the Division's copy. <br />This is also in the groundwater monitoring section of the <br />permit application. <br />2. More information should be submitted on the exact location of <br />the USGS water monitoring station for the North Fork of the <br />Gunnison River along with an brief explanation of how the flow <br />data is obtained. If it is possible to place this location on <br />the water monitoring location map or a generalized area map <br />this should also be done. <br />Once we receive and review this information, and all other comment <br />periods have elapsed, we should be able to make a decision to <br />approve the revision. <br />If you have any questions, please contact me. <br />Si erely, <br />~j_~ `~. <br />Anthony J. Waldron <br />Environmental Protection Specialist <br />cc: Dan Bear, Bear Coal Company <br />AJW/ajw <br />
The URL can be used to link to this page
Your browser does not support the video tag.