Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />STATF, <br />OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Naa ral Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 6]203 <br />Phone (303) 866-7581 <br />FAX (303) 866-358E~ <br />RECEIVED <br />NOV 14 2001 ~-b <br />OF' CO/Q <br />~~ <br />SNP o <br />i <br />~,„ <br />• rele <br />www,watecstate.co.us <br />Division of Minerals and Geology <br />Response to Reclamation Permit Application Consideration <br />DATE: November 14, 2001 l <br />TO: James C. Stevens, Senior Environmental Protection Specialist 7 Vrr1~ ~e~+kn' <br />CC: Division 2 Office: District 12 Water Commissioner <br />FROM: Michael P. Schaubs R.G. ~g <br />RE: Pit, File No. M-89-084 <br />Operator: Fremont County, <br />Contact: Kenneth S Klco 719 942 4178 <br />Section 23, Twp 20 S, Rng 71 W, 6th P.M., Fremont County <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or afrer mining operations. <br />^ T:he proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Ptior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of al] wells within 600 feet of the permit area. The applicant must then <br />olltain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />® Other: The reclamation plan indicates that a depression approximately 20 feet deep will remain afrer <br />reclamation is complete. If stormwater runoff collects in this depression and does not infiltrate <br />within 72 hours, [hen the runoff must be pumped out of the depression, or a substitute water supply <br />plan must be approved for depletions caused by evaporation. <br />COMMENTS: <br />