My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV15853
DRMS
>
Back File Migration
>
Revision
>
REV15853
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:27:14 AM
Creation date
11/21/2007 11:09:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982129
IBM Index Class Name
Revision
Doc Date
7/22/1997
Doc Name
FINANCIAL WARRANTY BOND REQUIREMENT ROCKY FLAT GRAVEL PIT PN M-83-129
From
DMG
To
L OTTO GOEMMER
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~II ~I~II~~I~~~~I ~I~ <br />999 <br />DIVISION OF MINERALS AND GEOLOGY <br />Depdtlmcnl UI Ndiural Resouree5 <br />111 3 Shormun $t., Room ? I S <br />Denvcr. Gilorsiu NO?01 <br />Phone: (1U 71 Nbb-356: <br />FAY: 17051 N7?-H106 <br />July 22, 1997 <br /> <br />STATE OF COLOlZADO <br />~~~ <br />DEPARTMENT OF <br />NATURAi, <br />RESOURCES <br />L. Otto Goemmer Roy Romer <br />P. O. BOx 165 governor <br />lames 5. LochheaN <br />La Veta CO, 81055 E>tecwive Director <br />Michael H. Long <br />Division Director <br />RE: Financial Warranty (Flood) Requirement-Rocky Flat Gravel Pit-Permit <br />No,. M-82-129 <br />Dear Mr. Goemmer. <br />On June 27, 1997, the Division field inspected your mining operation and found only the problem of <br />no identifying sign at the entrance to the pit area. ~ <br />Subsequently, the file was reviewed and it was discovered that in a January 20, 1994 inspection <br />report you were required to increase your reclamation bond to $12,000 by April 27, 1994. That <br />increase was required to cover the cost of reclamation at your mine site while the Division and the <br />Boazd were considering a possible violation for affecting land outside the permit boundary and <br />during the time you were amending your permit under a Board Order. On July 22, 1997, in an <br />adequacy letter regarding your amendment application your bond was recalculated at $11,000 and <br />you were required to post the bond by September 20, 1994. You have not met either of these <br />deadline dates. <br />As part of the June 27, 1997 inspection report, the reclamation costs were calculated again. This <br />time you aze required to provide an $11, 050 bond by September 15, 1997. You were informed that <br />the matter of failure to provide an increased bond would be scheduled for a hearing before the <br />Mined Land Reclamation Board at their August 27-28, 1997 meeting. This was in error, since your <br />deadline date is September l5, 1997, we will instead schedule the hearing for the Boards' <br />September 24-25 meeting. If you provide the increased bond by the September 15th date, we will <br />withdraw the matter from the Boards' meeting agenda. <br />Please call Lavem Lemay in our office at 303-866-3567 if you need assistance with bond forms or <br />bond information. If you need to discuss other matters regarding your permit please call me at the <br />same number. <br />Since <br />~0~`~ <br />~eury B. •@ettler <br />Environmental Protection Specialist <br />cc: Jim Stevens, DMG <br />M~.bssVwr.IJo <br />
The URL can be used to link to this page
Your browser does not support the video tag.