Laserfiche WebLink
iiiiiiiiiiiiiiiiiii- <br />~TATE OF CO~vi 9v~v <br />pIVISION OF MINERALS AND G~pLOGY <br />Department of Natural Resources <br />1317 Sherman St., Room 215 <br />Denver, Colorado 8020] <br />Phone: 1303) a66-3567 <br />FAX: 13031832-8106 <br />February 17, 1999 <br />Phil Hegeman <br />Colorado Department of Health <br />Water Quality Control Division Permit Section <br />4300 Cherry Creek Drive South <br />Denver, CO 80222-1530 <br />RE: Technical Revisions Nos. 6 and 7, Bowie No. 2 Mine, Bowie Resources Ltd., <br />Technical Revision No. 30, Bowie No. I Mine, Bowie Resources Ltd. <br />Dear Mr. Hegeman: <br />~~ <br />DIVISION O F <br />MINERAL:~~ <br />& 1 <br />GEOLOGI'~ <br />R ECLAMATIO M1'I <br />MINING•SAFE TY i <br />gill Owens <br />Governor <br />Greg E. watcher <br />Evecutive Director <br />Michael g. Long <br />Division Director <br />As a recipient of a completeness letter from this Division concerning the above-mentioned technical revisions. <br />this letter is to inform you that there has been a change in the submittal of this information. For the Bowie No. <br />2 Mine, Bowie Resources has withdrawn Technical Revision No. 6, which involved the installation of a <br />downhill conveyor, coal stockpile and truck loadout and the relocation of a sedimentation pond and Technical <br />Revision No. 7, which involved the change in the mine plan to go to longwall mining with an increase in <br />production from 2 million tons per year to ~ million tons per year. For the Bowie No. I Mine, Bowie <br />Resources has withdrawn Technical Revision No. 30, which concerned an increase in production at the railroad <br />loadout front 2 million tons per year to 5 million tons per year. <br />In place of the withdrawn Technical Revisions Nos. 6 and 7, Bowie Resources will resubmit the information <br />under one permit revision. Technical Revision No. 30 will be submitted at a later time, again, as a technical <br />revision. <br />For your infotmation, Bowie Resources has submitted two additional technical revisions for the Bowie No. 2 <br />Mine. Technical Revision No. 8 requests a change in [he mine plan to extract coal in the west section of their <br />present petmit area. Technical Revision No. 9 is a request for an incidental boundary change to the permit area <br />in order to establish mine development in federal coal. Your organization will be receiving additional <br />information on these two new technical revisions when this Division finds the submittals to be complete. <br />If you have any questions, please call me. <br />Sincerely, <br />~~ ~~ <br />Ydseph J. Dudash <br />Environmental Protection Specialist <br />