My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV15481
DRMS
>
Back File Migration
>
Revision
>
REV15481
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:26:48 AM
Creation date
11/21/2007 11:06:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
8/12/1996
Doc Name
YOAST MINE PN C-94-082 MR 08
From
SENECA COAL CO
To
DMG
Type & Sequence
MR8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiu iii <br />999 <br />E~~A <br />-' Coal Company Seneca Coal Company <br />August 9, 1996 <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Yoast Mine Permit C-94-082, MR08 <br />Dear Ms. Crosby: <br />='' .yam' . ,ipl <br />~~CEIVED <br />AEG ~ ~ 1996 <br />a~~+~a~an c; Minerahs & u~oio,y <br />Enclosed please find three copies of an application for MR08 to the <br />Yoast Mine Permit C-94-082. This minor revision request is for the <br />addition the light-use road leading to Topsoil Stockpile D. This <br />revision is being submitted for the abatement for NOV C-96-016. <br />The portion of haul road "B" from approximately station 60+00 to <br />the coal mining recovery line where the haul road turns into a ramp <br />has been removed from the operations plan. This road was designed <br />at an approximate grade of 9.66. instead of constructing this <br />portion, the one existing road you observed during your July 31, <br />1996 inspection, will be a ramp within the coal recovery area and <br />• tie into the existing approved pit ramp. This same pit ramp will be <br />used to haul topsoil to stockpile D. A light-use road has been <br />added to Exhibit .l2-1, Sheet 2 of 2, to cover the portion of road <br />heading into the stockpile. The return light use road from the <br />stockpile you inspected has also been located to show this route as <br />well. <br />The information pertaining to this revision was faxed to Ms. Susan <br />Burgmaier on the morning of August 9, the deadline for abatement. <br />The revised materials are being sent to your attention UPS - Next <br />Day Air so you should receive them on Monday, August 12. <br />Enclosed are the required application form, insertion instructions <br />into the PAP, and the revised materials. Should you or any other <br />members of the Division have any questions regarding this <br />information, please do not hesitate to contact me. <br />Sincerely, <br />' ' / CCI QJ~ .7t1. U~ ~~-CLU t-v~'v' <br />Mic(((hael G. Altavilla, P.E. <br />Engineering Manager <br />Enclosure(s) <br />• C: John HllSbdnd (BLM) <br />Larry Kline (OSMRE) <br />Gary Wer~dt (PCWC(CLJ <br />eneca oa ompany • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.