Laserfiche WebLink
<br />DIVISION OF MINERALS AND GEOLOGY <br />DepanmeN of Natural Resources <br />Ill 3 Sherman St., Roam 215 <br />Drover, Colorado 80203 <br />Phunc~ 0031 N66~3567 <br />FAX (3031 tl32-81 Qb <br />February 23, 1998 <br />Bradford Janes <br />Professional Forester <br />408 Charlotte Street <br />Johnstown, CO 80534 <br />~T ~ 'rr <br />IIIIIIIIIIIII III <br />999 <br />II~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Ruv Romer <br />Governor <br />RE: Rocky Road Quarry, Technical Revision No. 1, Permit No. M-85-210 <br />Dear Mr. Janes: <br />I have completed my review of your technical revision application for the Rocky <br />addressing the location of the 106.5 acre permit boundary, the status of all distur <br />lands, the status of all lands currently being treated for reclamation, and the exist <br />quarry locations. The purpose of the revision application is to clarify adequacy i <br />stipulations associated with the approval of the February 1997 regular 112 conve <br />application. Listed below aze the adequacy concerns which must be resolved on <br />Mazch 2, 1998 decision date in order for the Division to approve your revision re <br />respond to the concerns listed below on or before February 28, 1998. If addition <br />to prepaze and submit your adequacy response, you may either request an extens <br />decision date or waive your right to a decision within 30 days of submittal. <br />lames 5. Lx hhead <br />E,ecmive Director <br />mi~nael e. ions <br />Division Direclrn <br />Road Quarry, <br />3ed (affected) <br />ing and planned <br />>sues and satisfy <br />before the <br />lest. Please <br />time is needed <br />~ of the <br />1. Please provide cross sections and plan views of typical post-mining contours ~s committed to <br />previously in your May 18, 1997 regulaz 112 conversion correspondance. <br />2. Please provide an updated reclamation seed mix as previously committed to ~n your May 18, <br />1997 regular 112 conversion correspondance. <br />3. As required by Rule 6.4.12 please provide all information necessary to calcul to the cost of <br />reclamation during a maximum disturbance of 25 acres. Specific information n ded is the total <br />length of existing haul roads, dimensions of pit disturbance(s), and extent of wa to pile(s) <br />(number of linear feet and representative cross sections). Itemized costs for ba kfilling and <br />grading of pit disturbance, finish grading of moderate disturbance, topsoil reapp ication, and <br />revegetation, and equipment mobilization/demobilization should be included. <br />o~ <br />RADO <br />4. Use of prelaw affected lands for the storage of stone during quarry activities ~s considered to <br />be a part of the on-going mining operation and will result in those lands subject o reclamation <br />