My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14749
DRMS
>
Back File Migration
>
Revision
>
REV14749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:59 AM
Creation date
11/21/2007 10:55:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984041
IBM Index Class Name
Revision
Doc Date
1/26/1990
Doc Name
APPLICATION FOR AMENDMENT OF 112 PN M-84-041 EXHIBIT L-RECLAMATION COSTS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ III IIIIIIIIIIIIIIII ~ ~ ~-Z~-~~ <br />APPLICATION FOR AMENDMENT OF 112 PERMIT NUMBER M-84-041 <br />EXHIBIT L - RECLAMATION COSTS <br />Areas (G) and (H) are currently covered by existing bonds in the <br />amount of $21,280.00. The annual report dated 11 December 1989 <br />illustrated that 19.05 acres of affected land exist in (G) and (H), <br />of which, reclamation has been started on 5.18 acres. <br />Reclamation costs for the areas anticipated to be affected by the <br />new mining operation are as follows: <br />LAND USE TYPE RECLAMATION COSTS MAX. AREA AMOUNT <br />LAND USE & <br />RECLAMATION <br />IN PROGRESS <br />mining and regrading w/wheelscraper $300/acre <br />excavation seedbed preparation 75/acre <br />associated seeding labor 15/acre <br />with mining seed 66 acre <br />to flat Total $456 acre 17.0 $7,752 <br />surface <br />mining and regrading w/loader $500/acre <br />excavation seedbed preparation 75/acre <br />associated seeding labor 15/acre <br />with mining seed 66/acre <br />to cut-steo Total $656 acre 3.0 1,968 <br />slopes <br /> regrading w/small dozer $100/acre <br />overburden- seedbed preparation 75/acre <br />topsoil seeding labor 15/acre <br />stockD <br />iles seed 66/acre <br />_ Total $256~acre 4.8 1,229 <br /> regrading w/wheel scraper <br />waste rock and small bulldozer $375/acre <br />disposal seedbed areparation 75/acre <br />stockpile seeding labor 15/acre <br /> seed 66/acre <br /> Total $531 acre 7.0 3,717 <br /> regrading w/wheel scraper $300/acre <br />processing seedbed preparation 75/acre <br />& product seeding labor 15/acre <br />stockpile seed 66/acre <br />area Total $456/acre 5.3 2,416 <br /> regrading w/backhoe $850/acre <br />haul road seeding labor 15/acre <br /> seed 66/acre <br /> Total $931/acre 5.7 __5,307 <br /> TOTAL 42.8 $22,389 <br />JEROME F. GAMBA 8 ASSOC. <br />CONSULTING ENGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.