Laserfiche WebLink
'~IYENTYMILE III IIIIIIIIIIIII III Twentymile Coal Corporation <br />~ COAL PiOMPANY 29515 Routt County Road k 27 <br />a Cypn,s nma: company Oak Creek, Colorado 80467 <br />970.8793800 <br />n4arch I8. 1996 gcr.Fl`'r' <br />loner t?imts MeR 2 fi 1997 <br />I:nvirunmental Protection tipccialisl <br />Division of ~4incrals and Geology ,., ..~~,I, <br />~rv+s+on o, ,.,~~,,,,.~,, .. _ <br />1313 4hcrman Sueel, Room 215 <br />I~enccr. Colorado 80203 <br />Re: Permit No. C-82-056: Response to Comments: Technical Revision 97-27, <br />Licske Substation and Power Linc Installation <br /> <br />I hank coo fbr considering complete for the purpose of tiling on March 12. 197 the <br />abacc listed l~cchnical Revision. A copy of [hc revised Public Notice is enclosed which <br />gives the UtiGS ~uadranglc location in which the upgrades, power lines. and associated <br />chan~_c in permit boundary are located. The follmving respons~s are prop ided with re~~ard <br />to Dig isiuns crnnmen[s: <br />Permit page 2.05-16(gj is incorporated in TR-27. The sentence''fhese conditions <br />will he considered as facilities outside the permit boundan~ titr TCC.' has been <br />changed to read "The permit boundary will be extended to include the Last ;'. of <br />Section 12, in TAN, R8(iW to include these additions." <br />2. Permit Page 2.0~-~4(t)(67) has been updated to indicate that the revised rusts are <br />associated with TR 97-27. <br />±. The hvo pages referenced above are considered part of TR 97-''7. C'opics of these, <br />updated pages are included with this submittal. <br />4. V1R 97-146 has been withdrawn and resubmitted as TR 97-27. Please close the <br />file on ~iR 97-146. <br />~. l he second page of Exhibit O has been changed to indicate that TR 97-37 adds <br />the Last I/2 of Section 12 in TAN, R86W to the TC'.C permit boundary. <br />6. fhe substation and roadway are owned by Y"VGA and were constructed under a <br />blanket easement dating back to 1940. TCC does not own the substation area. <br />TCC' is responsible for the pads and equipment installed at the substation. the <br />power poles and electric line. Surface drainage from the 10' x 8" and ~' x ~~ pads <br />