My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14125
DRMS
>
Back File Migration
>
Revision
>
REV14125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:17 AM
Creation date
11/21/2007 10:48:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Revision
Doc Date
6/12/1995
Doc Name
APPLICATION
From
J E STOVER & ASSOCIATES
To
DMG
Type & Sequence
TR8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. 1. <br />J . E . STOVER & ASSOCIATES III IIIIIIIIIIIIIIII <br />2768 COMPASS DRIVE, SUITE 101 999 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONSTRUCTION MANAGEMENT <br />June 8, 1995 <br />-~FCEivFn ` <br />c. E. Johnston JUN ~ 2 1995 <br />Division of Minerals and Geology <br />1313 Sherman St . , Room 2 15 Division of iwinerals <br />Denver, CO 80203 & Geology <br />Re: Terror Creek Company <br />Application for a Technical Revision <br />Permit No. C-83-059 <br />Dear Ms. Johnston: <br />Enclosed is an application for a technical revision to provide for <br />the construction of a concrete containment for TCC's diesel and gas <br />tanks. New permit page 2.05-2c summarizes the recent diesel fuel <br />spill and describes the proposed concrete containment. The <br />Colorado Department of Public Health and Environment's approval <br />letter for disposal of the special waste and the ENVIRO-CHEM soil <br />sample analyses lab sheets will be incorporated into Exhibit 12 to <br />document the spill clean-up project. Map 5 was not revised because <br />the new fuel containment area will be constructed in approximately <br />the same location as the old area. <br />The additional reclamation bond amount required for the concrete <br />containment is calculated as follows: <br />Floor 6 Walls 660 SF + 232 SF = 892 SF @ $3.01 $ 2,684.92 <br />Floor Walls <br />Indirect Expense @ 25.43$ <br />Total Additional Hond Expense <br />Please call if you have any questions. <br />Jim Stover, P.E. <br />Consulting Engineer <br />Sincerely, <br />682.78 <br />$ 3,367.70 <br />7 <br />cc: Kelly Fritzler <br />
The URL can be used to link to this page
Your browser does not support the video tag.