III IIIIIIIIIIIII III <br />999 <br />TEMPORARY MINE WATER DISCHARGE POND E <br />BONDING COST ESTIMATE <br />The following summarizes the es[imated coscs associated with reclaiming Temporary Mine <br />Water Discharge Pond E: <br />Grade Embankment into Pond Basin and Regrade Disturbance <br />Area (0.91 acre-feet x 43,560 cuk/af / 27) @ $0.60/yd $ 900.00 <br />Soil Replacement - 1 acre x 43,560k/acre x 1 Foot /27) @ $0.50/yd $ 800.00 <br />Revegetation - 1 acre @ $1,000/acre $ 1,000.00 <br />Total Direct Costs $ 2,700.00 <br />Total Indirect Costs ((cp 12 percent) $ 330.00 <br />Total Estimated Reclamation Cost $ 3,030.00 <br />