My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV13934
DRMS
>
Back File Migration
>
Revision
>
REV13934
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:06 AM
Creation date
11/21/2007 10:46:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Date
11/2/1995
Doc Name
PARTIAL PHASE I BOND RELEASE INSPECTION KERR COAL CO MARR STRIP MINE PN C-80-006 BOND RELEASE REQUES
From
DMG
To
KERRCO LTD
Type & Sequence
SL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III 1111111111111111 <br />999 <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />DeparuneN of Nglural Resources <br />I :i13 Sherman 51., Room 215 <br /> <br />Denver, Colorado R0203 II~~~ <br />Phone: 13031 R66 35fi7 <br />F Aa.(303183?-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br />November 2, 1995 <br /> koy Romer <br /> Governor <br />lame S Lochhead <br />Kerrco, Ltd. ExecWrve Director <br />A Colorado Limited Partnership ALChael B. Long <br />One Tabor Center, Suite 2500 ow~s~~n otrector <br />Denver, CO 80202 <br />RE: PARTIAL PHASE I BOND RELEASE INSPECTION - Kerr Coal Company, <br />The Marr Strip Mine - Permit No. C-80-006, <br />Bond Release Request No. SL-O1 <br />Dear Sir or Madam: <br />The Division wishes to inform you of its intent to conduct a partial <br />Phase I Bond Release inspection at the Marr Strip Mine in Jackson <br />County, Colorado. This mine is permitted by Kerr Coal Company, and <br />is situated approximately eight miles east of the town of Walden. As <br />a surface owner, you may participate with the Division in conducting <br />this inspection. <br />This inspection will begin at 12:00 noon, Tuesday, November 14, 1995. <br />The inspection will be conducted to evaluate the backfilling and <br />grading that Kerr Coal Company has implemented in Pit One of its <br />mine, per Technical Revision No. TR-13 to the Marr Mine mining and <br />reclamation permit. Pit One is located principally in the center of <br />the south half of Section 26, T9N, R78W, 6th P.M. <br />Please contact me at (303) 866-3567 if you have any questions. <br />Sincerely, <br />~ /J / / <br />Daniel I. Hernandez <br />Senior Environmental Protection Specialist <br />DIH/gaw <br />M:1ossUCerrBond. dih <br />
The URL can be used to link to this page
Your browser does not support the video tag.