Laserfiche WebLink
r III IIIIIIIIIIIIIIII <br />999 <br />111?icy '_.ai 1C n=C,L„Lia-iCil DI'/iSiGi 1 <br />Deparimem of Nawrai Fesources <br />t3t3 Sherman 9.. Room ~i5 <br />Denver. CO 80203 <br />303 866-3h6i <br />Fax 303 832 9106 <br />~. _ <br />~,~~ <br />;_~.~„, <br />~•/ ~o <br />~; ~ <br />- is' e . <br />Roy Ramer. <br />Governor <br />M~chae~ B. Long, <br />Division Dneotor <br />August 04, 1992 <br />Gary W. Wendt <br />Peabody Coal Company <br />1300 South Yale <br />Flagstaff, Arizona 86001 <br />RE: Seneca II-W Mine (C-82-057) <br />Technical Revision 18 <br />Preliminary Adequacy Review <br />rear Mr. Wendt: <br />The Division has completed a preliminary adequacy review of the submittal regarding relocation <br />of haul road culvert F-3. Your July 21, 1992 letter suggested that design information for the <br />haul road ditch and culvert are located in the permit application package. Our review of the <br />permit application showed that the material was incomplete. The Division is in need of the <br />following information: <br />1. Please demonstrate that the relocated culvert and resulting change in hydraulics <br />of Pond 006 will provide adequate detention time so that the pond is in <br />compliance with Rule 4.05.2(7). Please submit a revised Attachment 13-4 and <br />Exhibit 13-6. <br />2. Please revise Tables 13-5 and 13-7-1 to reflect an increased watershed and <br />corresponding runoff for culvert F-3. <br />3. The design calculations in Attachment 13-6 do not appear to apply specifically to <br />the section of haul road ditch draining into culvert F-3. Please provide the <br />Division with calculations and demonstrations which consider the watershed size, <br />peak discharge, expected velocities, and necessary channel protection measures <br />for that section of the ditch. <br />Your July 21, 1992 letter stated that since the ditch is in a high maintenance area, <br />channel lining would not be feasible. If channe] protection is deemed necessary, <br />please include designs for alternate means of channel stabilization. <br />4. Please provide design details for the detention basin at the inlet of culvert F-3. <br />