Laserfiche WebLink
iii iiiiiiiui <br />DIVISION OF MINERALS AND GEOLOGY <br />[kpanrtxrn d NaLUral Resource <br />STATE OF COLORADO <br />RECEIVED <br />IJD~]~frGroml~nas~tpgp p32t5 MAY 1 g 2000 <br />PMre:r3031966-3567 <br />FAx: 0031 H32-8106 APPLICATION FORM FOR A REVISIOI~ivision of MineralsBGeology <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be cempleted and submitted with all requests for minor revisions, as defined in <br />Rule 1.04(731, technical revisions, as defined in Rule 1.0411361, and permit revisions, as defined <br />in Rule 1.041901, All revisions are to address the requirements of Rule 2.08.4. Three (31 copies <br />of the revision, including maps, must be submitted in order for it to be complete. <br />NATURAL <br />RESOURCES <br />Ror Ramer <br />Go,arru <br />Woes 5. Lodihead <br />Eaecvnve Oiraoa <br />MR1iad R. Lars <br />Oivnion Oirecta <br />All revisions are to be formatted so they can be inserted imo the permit to replace the revised <br />sections, maps, tables and/or figures, with a revised table of contents, if necessary. The revision submittal <br />date should be printed in the lower right corner of each revision page. A cover letter to the revision should <br />explain the nature of the revision and reference the spedfic permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing <br />list at the same time the application is submitted to the Division, and proof of distribution must be submitted <br />to the Division along with the application. Copies of revision pages modified during the review process must <br />be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. For non-federal mines, a copy of the application for which the <br />Division has issued a proposed approval decision must be submitted to the OSM Western Regional <br />Coordinating Center 11999 Broadway Blvd., Suite 3320, Denver, CO 80202-57331, and proof of submittal <br />to OSM must be submitted to the Division prior to implementation of the revision. <br />Permit No.: C-~ Z- ~ ~. ~ Date: 0_ 5 f 1 S i 0 0 <br />Pemtittee: T W E ~1 ~ v ~ ~ ~ ~ <br /> ~ Q ~~- L~ ~~A1>L~.---- <br />Street: .Z 9_ S_ ~ ~ - g JZ 1.L L L ~~ JJ ~I S Y <br /> ~. Q ~ ~ - ~ 1 Z - - - - - - - - <br />City: Q ~ L-~ ~. ~ E-~--------- <br />State: ~ Q Zip Code: ~ ~ ~ ~ L - - - - - <br />Brief Description of Revision: Installation of NMD Power Borehole <br />Public Notice Attached: Yes X No- (Required for PRs and TRs) <br />Bond Increase: Yes X No- Federal Non-Federal -Mine <br />Proposed Change in: <br />Disturbed Area (+l-) - - ~ 8 Acres Affected Area (+l-) - ~ - . _ Acres <br />Permit Area (+~_) - - ~ -Acres Federal Land (+~.) _ 0 _ -Acres <br />State Land (+~_) _ - 0 -Acres Private Land (+1-) - 0 - -Acres <br />