Laserfiche WebLink
<br />• iii iiiiiiiiniiiiii • <br />,,...,. __CK 8~ ASSOCIATES <br />6130 W. Vassar Way <br />Lakewood, Colorado 60227 Mining 8 Environmental Engineering <br />Telep~] a (303) 9857521 <br />(985-1 Sit <br />- ~ •- E-mail: jmb {10Lcom <br />E- y~o~o/ 8200 <br />FILE: ~1-g~-ORU M~ra~ <br />February 9, 2000 SITE: Cary ~ ¢G~i <br />Rec~ie~ <br />Mr. Steve S. Shuey, Sr. Environmental Specialist <br />Division of Minerals and Geology <br />484 Turner Drive -Building F-101 f• ~~ ~t ~ ~t:~11 <br />Durango, Colorado 81301 <br />Durango Fizlcl J~riCB <br />_Oivision of Minerals 8 Geology <br />RE: Camp Bird Mine (Permit No. M-82-090) <br />Phase II Site Reclamation Plan (Technical Revision No. 2) <br />Dear Mr. Shuey: <br />This is to confirm the content of our telephone conversation today. Camp Bird <br />Colorado, Inc. acknowledges the previously established February 15, 2000 <br />submittal deadline for the above-referenced document; however, circumstances <br />require a minimal delay in the finalization of the Technical Revision No. 2 <br />document. <br />As discussed, Camp Bird Colorado, Inc. will <br />No. 2 document not later than February 29, <br />of this extension, and your understanding in <br />be submitting the Technical Revision <br />?000. We appreciate your granting <br />this regard. <br />Sincerely, <br />J. M. BECK 8 ASSOC/AYES <br />M r~ <br />James M. Beck, P.E. <br />Principal <br />cc: S. Butters -Camp Bird Colorado, Inc. <br />J. Losse -Camp Bird Colorado, Inc. <br />