My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24420
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24420
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:13 PM
Creation date
11/21/2007 10:42:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Enforcement
Doc Date
8/11/1997
Doc Name
BOWIE 2 MINE AS BUILT INFORMATION PERMIT C-96-083
From
J E STOVER & ASSOCIATES
To
DMG
Violation No.
CV1997014
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER ~ ASSOCIATES <br />2768 COMPASS DRNE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245101, FAX 242-7908 <br />MINE ENOINEERINO <br />MINE REGLAMIITIDN <br />iii iuiuiiiiiu iii <br />999 <br />GML ENOINEERINO <br />CONST. MANAGEMENT <br />Via Federal Express <br />August 8, 1997 <br />RECEIVED <br />J. J. Dudash <br />Division of Minerals 8 Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie No. 2 Mine <br />As-Built Information <br />Permit C-96-083 <br />Dear Mr. Dudash: <br />j~jp 111997 <br />Division of Minerals & Geology <br />On Friday August 1" Bill Bear and I met at the DMG's offices with you and David Beny. <br />We discussed the field design changes to the project. Following is a summary of the <br />major field changes to the project. <br />1. The coal loadout silo and downhill conveyor will not be constructed at this time. <br />2. The haul road from old state highway 133 to the portal bench will be paved. <br />3. Guard rail will be installed along the haul road. <br />4. The portal bench and coal stockpile bench were combined into a single bench. <br />5. A reclaim system, crusher and screening building and radial stackers will handle <br />the coal on the portal bench. Coal will be loaded with front end loaders. <br />6. Coal will be transported by truck from the portal bench to the coal loadout silos. <br />7. Certain changes in the configuration of the drainage plan will be required as a <br />result of the above changes. <br />The DMG was not very concerned about changes to the coal handling facilities since <br />the scope of the coal handling facilities was reduced which should result in a reduction <br />in the required reclamation bond. <br />The DMG requested that BRL submit a map of the single portal bench so it can be <br />compared to the permitted portal bench and coal stockpile bench. Enclosed are new <br />Map Nos. Vll-2-N and V11-2A. Map No. VII-2-N presents the as-constructed benches <br />and can be compared directly with Map No. VII-2 presented in Volume VII, Tab 6. Map <br />No. VII-2A presents the section views A-A and B-B of the permitted and as-constructed <br />benches. These two section views are discussed in Volume VII, Tab 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.