My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24409
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24409
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:13 PM
Creation date
11/21/2007 10:42:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Enforcement
Doc Date
7/22/1993
Doc Name
REQUEST FOR ABATEMENT EXTENSION
From
ENERGY FUELS COAL INC
To
DMG
Violation No.
CV1993102
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
energy fuels coal, inc. <br />eouthlleld mina • poet office boa M9 • Ilorence, colaredo 87226 • (718) 769365 <br />July 19, 1993 qF(;F~\/Ef~ <br />JUL 22 ?90~ <br />Mr. Daniel I. Hernandez <br />Division of Minerals and Geology DiviSiOn Uf tiiiiiei~is a lawiuyy <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />RE: Notice of Violation No. C-93-102 Map Describing Proposed Surface Disturbance <br />Request for Abatement Extension <br />Southfield Mine -Permit No. C-81-014 <br />Dear Mr. Hernandez: <br />III IIIIIIIIIIIIIIII <br />999 <br />With this letter Energy Fuels Coal Inc. (EFCI) respectfully requests extension of the date for <br />abatement of NOV C-93-102. <br />Rectuired Remedial Action: Submit, and receive approval of, a new Map 18 that correctly identifies <br />These (surface dismrbances) areas within the surface disturbance boundary. <br />Current Abatement Stams: EFCI is field surveying and mapping those surface disturbances not <br />currently shown on Map 18. Along with this, there is still discussion on which sections of public and <br />private roads, if any, are to be included within the above disturbed area pcrimeters. Upon completion of the <br />field work, EFCI will prepare and submit a certified Map 18 to abate the subject NOV. <br />The required abatement date W submit, and receive approval of, a revised Map 18 is July 30, 1993. <br />Given the need to complete the field work and obtain map certification from our engineering consultant, <br />EFCI hereby requests extension of the abatement date for NOV C-93-102 to August 30, 1993. <br />Sincerely, <br />Allen S. Weaver <br />Mine Engineer <br />cc: Randy Acre (EFCI) <br />Jerry Nettleton (ACZ) <br />Tom Leidich (ACZ -Denver) <br />
The URL can be used to link to this page
Your browser does not support the video tag.