Laserfiche WebLink
~ iii iiiiiiiiiiiii iii ~ <br />EXf[l[3TT L <br />RECLAMATION COSTS <br />ANTELOPE HILL GRAVEL PIT <br />Reclamation costs to prepare the soil for reclamation, including loosening, leveling, topsoil distribution, <br />seeding, etc. will he considered as within the opemling costs of the gravel crushing operation. Costs of <br />re-seeding of the entire area will be approximately $5,657 for Phase 1-IV and $994 for Phase V if the <br />recommended seed mixture is used. If Blue Grammy can be substituted for Ilse Gallella Gmss the re- <br />seeding cost would be $1,761 for Phase I-IV and $G61 for Pllase V. Any costs assiciated wish the <br />necessary broadcasting of Ilse seed mixture will he as part of the operating costs of the operatien as well. <br />The seed mixture recommended by the Soil Conservation Service is as follows: <br />(a) Galletla Grass = 1.6 Ib." <br />(b) Indian Rice Grass = 3.75 Ib." <br />(c) Siberian Whcalgrass = 2.2 Ib." <br />Ldl Yellow Swccl Clavcr - 0 7 Ih " <br />TOTAL = 8.251b." <br />" Pure Live Sccd <br />6A.I:prvanll dx P.2 <br />