My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV13388
DRMS
>
Back File Migration
>
Revision
>
REV13388
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:24:25 AM
Creation date
11/21/2007 10:41:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
5/26/1998
Doc Name
SANBORN CREEK MINE PN C-81-022 PROPOSED DECISION MINOR REVISION NO 46 ALTERNATE SEDIMENT CONTROL
From
DMG
To
OXBOW MINING INC
Type & Sequence
MR46
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiuiiniu iii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resourres <br />131 7 Sherman 51 . Room 215 <br />Denver, Colorado 80203 <br />Phone: 13031 866J56: <br />FAX: (303181?-81U6 <br />May 26, 1998 <br />Thomas C. Anderson, PE <br />Oxbow Mining, Inc. <br />P.O. Box 535 <br />Somerset, CO 81434 <br />Re: Sanborn Creek Mine (Permit No. C-81-022) <br />Proposed Decision -1Vlinor Revision No. 46 <br />Alternate Sediment ControUSAE West Valley Fill <br />Dear Mr. Anderson, PE: <br />M1 <br />~~I~I~ in <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Rnv Romer <br />Gnve+nor <br />lames 5 Lochhead <br />Evecwive Dueaor <br />Michael B Long <br />Divrsion Direanr <br />Enclosed you will find the Division of Minerals and Geology's Proposed Decision Form for Minor <br />Revision No. 46 at the Sanborn Creek Mine. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision fotm. If the amount of <br />"Bond Held" equals or exceeds the "Revised Liability", you need not submit additional bond. However, <br />if the "Revised Liability" exceeds the "Bond Held", please submit additional bond or rider to your existing <br />bond that equals or exceeds the "Revised Liability". The revision will not be final until the bond is <br />approved by the Division. <br />If you h~y questions, please contact me. <br />S cerely, ;~ <br />:~ <br />% ~: <br />Davi~ erry <br />i$enio En ironmental Protection Specialist <br />DAB/JRC <br />Enclosure <br />cc: Lawrence Kline, Office of Surface Mining, with enclosures <br />hl'.\OSSV RC\TEht P.ChlR06o?7 DAB <br />
The URL can be used to link to this page
Your browser does not support the video tag.