My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV13240
DRMS
>
Back File Migration
>
Revision
>
REV13240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:24:15 AM
Creation date
11/21/2007 10:40:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
5/21/1998
Doc Name
RN03/PR04 PROPOSED DECISION
From
DMG
To
TRAPPER MINING INC
Type & Sequence
RN3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.? <br />iii iiiiiiiiiiiuiii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />DcpanmeM n( Natural ReSOUrCeS <br />I{ I f $horman 51., Roam ? I S <br />Dcnv,•r. Grlorarlo 80'_01 <br />Phunc: (1011 865-1567 <br />rr\a: 110.11 81~'-8106 <br />May 21, 1998 <br />Forrest V. Luke <br />Trapper Mining Inc. <br />P.O. Box 187 <br />Craig, CO 81626 <br />Re: Trapper bline (Perm's[ No. C-81-010) <br />Proposed Decision <br />Permit Renewal RiV-03/Permit Revision PR-04 <br />Dear Mr. Luke: <br />~~~~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Rnme. <br />Governor <br />lames S. Lochhead <br />E.ecuirve Oveaar <br />micharl 8. Lang <br />Division Director <br />Enclosed you will find the Division of Minerals and Geology's "Proposed Decision and Findings <br />of Compliance" and the proposed decision documents for the above-referenced permit <br />renewal/revision. Notice of the proposed decision will be published in the Craig Daily Press as <br />soon as possible. The first publication will initiate the thirty (30) day public comment period for <br />the Division's decision. <br />Documentation must be submitted to the Division demonstrating that copies of the approved <br />renewal/revision application waere sent to the Office of Surface Mining and the Bureau of Land <br />Management. The copies should be sent within 15 days of final approval. <br />Please be advised that federal mine plan approval may need to be obtained from the Office of <br />Surface Mining Reclamation and Enforcement (OSM). OSM approval is required, in addition to <br />State permit approval, before operations affecting federal coal may commence. <br />Please submit additional bond or a"rider to your existing bond so that your bond held by the <br />Division equals or exceeds the "Revised Liability" shown on the enclosed proposed decision form. <br />The revision will not be final until the bond is approved by the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br /> <br />Tom Kaldenbach <br />Environmental Protection Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.