Laserfiche WebLink
__ II ThOMAS PST <br />• lil'llllllllllll ~il • <br />999 <br />Gf7VIIlAL INSTRUCTIONS FOR <br />FUGITIVE PARTICULATE AIR fi7LLUTANT F1`fISSION NOTICE / GnNTfd~L PLAID <br />An Air Pollution 1]nission Notice and Fugitive Particulate Control Plan must be <br />submitted with an application for an Emission Permit. Completion of this form <br />will meet these requirements. Complete on1Y those sections of this form which <br />are applicable to your operation. All data given, such as production rates, <br />topsoil removal, etc. should be for that period of 12 months that is expected <br />to have the greatest amount of activity, usually the first year. F3nissions <br />will 6e calculated in terms of pounds per day and tons per year of <br />particulates generated. Also, please submit the following, if available: <br />1. A map showing site location, haul roads, and nearby residences or <br />commercial structures. <br />2. Production schedule. <br />3. Schematic of the operation. <br />4. Engineering or manufacturing data on control equipment. <br />PERMITS REIXIIRED <br />Fugitive Particulate Emission Permits are issued for site-specific <br />activities, such as mining, storage of materials, haul Woad activities, etc. <br />Any processing equipment, such as a crusher, screen deck, or asphalt plant <br />is considered to be portable and requires a separate permit application, Air <br />Pollution Emission Notice, and filing fee. <br />This aids the applicant b,v requirirL4 only a revised Air Pollution Emission <br />Notice for relocation, whenever the equipment is moved to s new site. <br />Fes' ~~$~o UCi.J 7-l-1L <br />A filing fee of 96&x66 shall accompany each Air Pollution Emission <br />Notice /Control Plan filed with a permit application. Permit processing will <br />be charged for the amount of time the Division spends evaluating the permit <br />application. These fees, plus an,v required public notice fees, must be psid <br />before an Initial Approval Permit will be issued. Once the project has <br />commenced operation, an inspection will be conducted by the Division. Zf s11 <br />permit. conditions are met, a Final Approval Permit will be recommended. Final <br />Approval Permit processing fees must be paid before the Final Approval Permit <br />is issued. <br />