Laserfiche WebLink
STATE OF <br />DIVISION Of MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman $t., Room 21 S <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />December 6, 2002 <br />Mr. Paul Garrett <br />Fremont County Board of Commissioners <br />615 Macon Ave., Room 105 <br />Canon City, CO. 81212 <br />Re: Fremont County Pit, Amendment Application, M-1984-117 <br />Deaz Mr. Garrett: <br />~~~ <br />DIVISION OF <br />MII~IERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•S AFETY <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Executive Dire¢ar <br />Ronald W. Cattany <br />Acting Division Director <br />The Division completed a technical review of your amendment application. In order to meet the <br />minimum requirements of the ActrConstruction Mineral Rules and Regulations, the following <br />items need to be addressed: <br />Application -Please submit a revised page 1 of the application packet. Page 1 needs to be <br />revised to include the correct permit name (Fremont County Pit), the correct permit number (M- <br />1984-117), the correct current permit acreage (7.6 acres), the correct change in acreage (2.3 <br />acres) and the correct total acreage (9.9 acres). Need one original and one copy. <br />1. Exhibit A -Must contain a map showing information sufficient to determine the location of <br />the affected land and must contain the names of all adjacent surface owners of record. <br />2. Exhibit B - OK <br />3. Exhibit C - OK -the mining plan is described in the original permit under Exhibit B. <br />Additional Concerns; <br />Since the existing approved timetable of operations is out-dated, the applicant needs to specify <br />estimated dates that mining will commence and end. <br />Also, if the operation is intended to be an intermittent operation as defined in C.R.S. 34-32.5- <br />103(11)(b), the applicant should include in this exhibit a statement that conforms to the <br />provisions of Section 34-32.5-103(I1)(b), C.R.S. <br />Will the pit be excavated deeper than the approved 20-foot limitation? If so, will groundwater be <br />encountered? <br />The applicant needs to specify the thickness of overburden, if any, to be removed to reach the <br />deposit. The location of overburden stockpiles must be shown on exhibit E Mining Plan map. <br />Specify the thickness of the deposit to be mined. <br />