My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV11766
DRMS
>
Back File Migration
>
Revision
>
REV11766
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:22:43 AM
Creation date
11/21/2007 10:25:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
Revision
Doc Date
8/20/2001
Doc Name
APPLICATION FORM FOR A REVISION TO A COAL MINING & RECLAMATION PERMIT
Type & Sequence
MR28
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~0 ~ III IIIIIIIII IIII III <br />n ~~• <br />•,~; COLORADO DIVISION OF MINERALS AND GEOLO(. _ 999 <br />'as • 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 REC <br />EIVr; n <br />AUG 2 0 2001 <br />TO A COAL MINING AND RECLAMATION PERMIT Division ofMlnerarsgS~l~y <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be submitted <br />in order for it to be complete. <br />Alt revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of cortterrts, rf necessary. The revision submittal date should be printed in <br />the lower right comer of each revision page. A cover letter to the revision should explain the nature of the revision <br />and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modfied during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be sutxnitted <br />prior to implementation of the revision. <br />Permit No.: C - 84 063 Date: 08 / 16 / 01 <br />Permittee: Eastside Coal Company. Inc. <br />Street: PO Box 701007 <br />City: San Antonio <br />State: TX Zip Code: 78247 - <br />Brief Description of Revision: Revised Dane 3 of permit renewal application to change <br />actual and proposed Disturbed Area (Line 11) to six (6) acres respectively. Also the current <br />estimated life of mine is changed to 5 veers (Line 17). <br />Public Notice Attached: Yes _ No X (Required forPRs and TRs) <br />Bond Increase: Yes No X Federal Non-Federal X Mine <br />Proposed Change in: <br />Disturbed Area (+/-) =6. 0 Acres <br />Permit Area (+/-) _0_ _ Acres <br />Affected Area (+/-) 0 _ Acres <br />Federal Land (+/-) 0 _ Acres <br />State Land (+/-) 0 _ Acres Private Land (+/-) 0 _ Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.