My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE23335
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE23335
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:40 PM
Creation date
11/21/2007 10:24:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Enforcement
Doc Date
12/28/1981
Doc Name
SETTLEMENT AGREENENT
Violation No.
CV1981032
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SiniE OF COLO~.~r'O vu ...~eii n. ..~''~„v.. III III III IIIIIII III <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Moete Pascoe, Eaetu [ive Director <br />1ICYED La~D RE(:L.A1IA'I'[O <br />423 Centennial Building. 1313 Sherman Street <br />Denver. Colorado 80203 Tel. (303) 855-3567 <br />David C. Shelton <br />Director <br />SETTLEMENT AGREEMENT <br />MINE NAME: Trinidad Basin <br />PERMITTEE: Trinidad aasin Mining, Inc. <br />MAILING ADDRESS: P. o. Box 783, Trinidad, Colorado 81082 <br />OPERATOR (If Other Than Permittee): same <br />MAILING ADDRESS: <br />COUNTY: Las Rnimas TYPE OF MINE <br />PERMIT NO.: c-oa8-81 <br />VIOLATION NO.: <br />Contour Strip Coal <br />81-32 <br />The Mined Land Reclamation Division ("the division") issued a certain notice of <br />proposed amount of civil penalty, and the operator requested a conference theron, as <br />authorized by C.R.S. 1973, 34-33-123(8). The requested conference having been held <br />as required by law, the Division and the operator hereby agree as follows: <br />1. The amount of the penalty shall be 5 300.00 ; <br />2. The penalty shall be paid to the Division by the operator not later than 30 <br />days from the date hereof; <br />3. Payment of such penalty by the operator shall constitute a waiver of all fur- <br />ther rights to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days <br />after the closing date of such conference, which date is set forth below opposite the sig- <br />nature of the conference officer. If not so signed, the Division will fix the penalty at <br />whatever amount it deems appropriate based upon the factors referred to in C.R.S. 1973, <br />34-33-123-(8)(d). <br />DATE: <br />DATE: December 28, 1981 <br />OPERATOR: <br />BY: <br />DIVI ON OF MINED LAND RE~~LA ION <br />Conference Officer <br />2/81 C.R.S. 1973, 34-33-123(8)(c)(d) <br />Jate of Issue <br />___S~tember 15___. Iq 81 <br />-;:________Micha el S. Sa vase- Reclamation Specialist <br />Printed Name of eutnoriz°d Reuresentative <br />l0/79 C.R.S. t973. 34-33-123(9)(x). (b) <br />
The URL can be used to link to this page
Your browser does not support the video tag.