My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE23170
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE23170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:36 PM
Creation date
11/21/2007 10:21:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
6/1/1995
Doc Name
SAN LUIS PROJECT PN M-88-112
From
DMG
To
BATTLE MTN RESOURCES INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• iii iiiiiiiiiiiii iii , <br />STATE OF <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1317 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone (3031 866-3567 <br />FAX: 13031 8328106 <br />June 1, 1995 <br />Ms. Sally Hayes <br />Battle Mountain Resources, Inc. <br />P.O. Box 310 <br />San Luis, CO 81152-0310 <br />RE: San Luis Project, Permit No. M-88-112 <br />Dear Ms. Hayes: <br />Aker reviewing the permit files I have determined that the following list outlines the monitoring and <br />reporting requirements for BMRI: <br />~w.'.. <br />I~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />dames 5. Lochhea8 <br />E eecwive Director <br />Michael B Long <br />Division DueUOr <br />1. Pursuant to TR-06 - bi-weekly reports for surface stations RS-S and RS-6; monitoring wells <br />M-2, M-6, M-7, M-8, M-9, M-12, M-13, M-13R, and M-14; pre~etox, post etox, tailings <br />impoundment, collection pond, and lysimeters. I(a sufficient sample volu a cannot be <br />obtained then a report is not required. <br />2. Pursuant to TR-06 -quarterly reports for surface stations RS-1 through RS-6;j monitoring <br />wells D87-24, M-1, M-2, M-4, and M-6 through M-14. If a sufficient sample volume <br />cannot be obtained then a report is not required. <br />3. Semi-annual reports for the offsite water wells. <br />4. Pursuant to TR-10 -weekly and monthly reports reflecting results of daily ohsite analyses <br />of the tailings pond and the collection pond. <br />5. Pursuant to TR-10 -monthly summary reports of cyanide analyses performejl on tailings <br />exiting the INCO circuit. <br />6. Monitoring reports for the main embankment piezometers (once a month) ahd the tailings <br />piezometers (every quarter). <br />If you agree, or disagree, let me know. Or, if you have information that differs from mine Ikt me know. <br />I have enclosed a copy of a letter the Division sent to Ms. Nora Jacquez regarding the abov@ noted <br />reporting requirements. <br />Sincerely, <br />r~ •(.Lr7~ ~~ n r~C- <br />James Dillie <br />Environmental Protection Specialist <br />Enclosure <br />M:IOSSamm~noniror.jtl <br />
The URL can be used to link to this page
Your browser does not support the video tag.