My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10273
DRMS
>
Back File Migration
>
Revision
>
REV10273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:13:24 AM
Creation date
11/21/2007 10:10:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Revision
Doc Date
11/25/1997
Doc Name
CORRECTIVE ACTION ORDER C-81-071 MINE 2 PHASE II/III BOND RELEASE REQUEST SL-06
From
DMG
To
COLO YAMPA COAL CO
Type & Sequence
SL6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COL~lllllllllllllllll <br />DIVISION OF MINERALS AND GEOLOGY <br />Depdnmcnl of Natural Kcsour[c~ <br />111 1 Sherman 51., Kuum :15 <br />Denver, Colorado HII!l13 <br />Phone: 110 4 H6fi-3567 <br />FA%: 111111 N}2-A I UL <br />November 25, 1997 <br />Mr. Richard Mills <br />Colorado Yampa Coal Company <br />29515 Routt County Road No. 27 <br />Oak Creek, CO 80467 <br />Re: Corrective Action Order, C-81-071, Mine 2 <br />Phase 11/II[ Bond Release Request, SL-06 <br />Deaz Mr. Mills: <br />~I~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Rny Kutner <br />Governor <br />lanic• S Lua hhc,ul <br />E.rr nhve DurUnr <br />Miah,u~l tl. Long <br />Diviann Uneunr <br />As a result of the Division's Bond Release Inspection conducted October 14, 1997, and the <br />follow-up inspection conducted November 18, 1997 the Division orders the following corrective <br />action to be completed prior to the Division proposing a decision on the final bond release of the <br />Eastern Bond Release Block. (Rule 3.03.2(5)(a)). Please bring the un-named livestock pond <br />located at the head (northern extent) of PG 6-2 into agreement with Rules 4.05.9(1), (6), and <br />(10). Please submit a copy of the certification to the Division upon completion. <br />The projected decision date for the bond release application is December l3, 1997. Submittal <br />of the "as-built" certification showing accordance with livestock pond designs by December 8, <br />1997 should allow the Division time to review the certification and make a proposed decision <br />within the sixty-day time frame. <br />Should you have additional questions, please call me. <br />Sincerely, <br /> <br />anet H_~Bin ~~ c~~~" <br />Environ ental Prote'c-~io-n Specialist <br />__~ <br />Cc: Dan Hernandez, Division of Minerals and Geology <br />Mitch Rollings, OSM- DFD <br />c:\j hb\C81071 \SL06CA <br />
The URL can be used to link to this page
Your browser does not support the video tag.