Laserfiche WebLink
~~N-`• <br />III IIIIIIIIIIIIIIII <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department o(Nalu ral Resources <br />1313 Sherman SL, Room 215 <br />Denver, Colorado 80203 <br />Phone: 13031 866-356: <br />FA%: p03) 832-8106 <br />February l6, 2001 <br />Donald W. MacDonald <br />Coors Energy Company <br />P.O. Box 467 <br />Golden, CO 80402 <br />Re: Keenesburg Strip Mine (Permit No. C-1981-028) <br />Proposed Decision -Technical Revision No. 33 (TR-33) <br />Incidental Boundary Change <br />Dear Mr. MacDonald: <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Bil I Owens <br />Governor <br />Greg E. lValcher <br />E.ecmire Dircaor <br />Michael 8. Lon¢ <br />Drv~s~on Direcmr <br />Enclosed you will find the Division of Minerals and Geology's Proposed Decision for Technical Revision <br />No. 33 at the Keenesburg Strip Mine. Notice of the proposed decision will be published in the The So)uh <br />Weld Sun as soon as possible. The first publication will initiate the ten (10) day public comment period <br />for the Division's decision. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of <br />Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the <br />Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond <br />that equals or exceeds the Revised Liability. The revision will not be final until the bond is approved by <br />the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />Byrdn G. Walker <br />Environmental Protection Specialist <br />BGW/Jrc <br />Enclosure <br />GTR~08_C 1981028_BGW 20010'_16_1?323 PAI <br />