i <br />RECLAMATION COSTS (AMENDED AND REVISED 4/BS) <br />Illllllllll11111111 <br />EXHIBIT L <br />The mining of two minerals from the same lease but from <br />different areas will change substantially the maximum area disturbed <br />at the moment of greatest disturbance. The operator anticipates <br />that time will occur when clay mining in Stage I is completed and <br />when half of the sand and gravel in Stage C has been removed. <br />When Stage I is completed the mined area requiring reclamation <br />will total 4.91 acres +/- and recontouring will be needed on 3.46 <br />acres +/-. When mining in Stage C is 50 percent complete, <br />10.74 acres +/- will require reclamation. The 3.46 acres +/- in <br />stage I is in the 10.74 acres +/- needing revegetation in Stage C. <br />In Stage D overburden stripped to facilitate clay mining will be <br />stockpiled on 5.00 acres +/-. Thus a total of 20.65 acres +/- will <br />have to be resoiled and reseeded. Costs of reclaiming the areas <br />in the Stages C and i have been estimated from the following data: <br />Grass seed mix, 9.50 lbs./ac.@ $5.38/lb. <br />Fertilizer mix, 200 lbs. @ $16/100# <br />Mulch (straw) 66 bales/ac. @ $0.70/bale <br />Labor for seed drilling and fertilizing <br />8 hrs/ac @ $13/hr <br />Labor, other--16 man hrs @ $6.50/hr <br />REVEGETATION COSTS PER ACRE <br />Discing, 2 hts/ac @ $50/hr <br />Respreading soil, maximum haul less than <br />500 ft (1 ac x 43560 x 10 in./12 in.)/27 = <br />1344 cy/ac x $.60/yd <br />Grading and recontouring. 4 hrs/ac @ $60/ac <br />RECLAMATION COSTS <br />Respreading soil, 20.65 ac @ 5806.04 <br />Revegetation, 20.65 ac @ $337.33 <br />Grading and contouring, 3.46 ac @ $240.00 <br />Discing, 20.65 ac @ $100/ac <br />TOTAL RECLAMATION COSTS <br />$ 51.13 <br />32.00 <br />46.20 <br />104.00 <br />104.00 <br />$ 337.33 <br />100.00 <br />806.04 <br />240.00 <br />$ 16,652.16 <br />6,965.86 <br />830.40 <br />2.065.00 <br />$ 26,513.42 <br />SUGGEST BOND BE SET AT $27,000 <br />