My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE22314
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE22314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:04 PM
Creation date
11/21/2007 10:09:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Enforcement
Doc Date
2/7/2001
Doc Name
FOIDEL CREEK 2000 SURFACE WATER SAMPLING
From
STEVE MILLER
To
JANET BINNS
Violation No.
CV2001004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiniuiii <br />Binns, Janet 999 <br />Subject: Foidel Creek 2000 Surface Water Sampling <br />Entry Type: Phone call <br />Contact: Steve Miller <br />Company: Twentymile Coal Company <br />Start: Wed 02/07/2001 3:45 PM <br />End: Wed 02/07/2001 4:00 PM <br />Duration: 15 minutes <br />I called Steve Miller regarding comments Kent Gorham had with regards to TCC's 2000 surface water sampling of sites <br />Foidel Creek's sampling schedule is shown in Exhibit 14, p. 14-8, Table A (rev. 4/11/00 TR-36). <br />Kent had noted that instead of sampling sites USGS 09243800, 8, 14, 304, USGS 09243900, 16,16A, 302, 1002, 27A, <br />1003, MC-1, USGS 09243700, and 29, as per the Table A schedule: "Sampling will be performed on a flexible schedule <br />throughout normal flow period, March through September. Within this time frame, Flow and field parameters will be <br />measured twelve (12) times an four (4) full suite analyses will be conducted.". Instead TCC sampled these sites quarterly. <br />Steve said that he understood that TR-35 had changed the sampling schedule and Rick had told him in June when Steve <br />took over the sampling that the Table A in the permit was in error and Steve should sample the mentioned sites quarterly. <br />I reminded Steve that the table A approved in TR-35 (rev.4111/00) is the approved sampling program. If Rick had <br />questions about the sampling schedule as stated in the approved page, he should have contacted the Division. Steve <br />admitted that he had just started the water sampling in June, so he followed Rick's direction. He is also sampling this way <br />for the 2001 water year. <br />I told him I would talk with Kenton if we want him to continue on the quarterly sampling or revert back to the approved <br />schedule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.