My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE22151
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE22151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:57 PM
Creation date
11/21/2007 10:06:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Enforcement
Doc Date
6/28/1993
Doc Name
Memo on Abatement Extension Request
From
DMG
Violation No.
CV1993024
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparimem of Natural Resources <br />1313 Sherman SI., Room 215 <br />Denver, CO 80203 <br />Phone: IIOJ) 866-3567 <br />FAx: (3031832-8106 <br />DATE: June 28, 1993 <br />TO: Michael B. Long, Director <br />FROM: Susan Morrison ~~ <br />RE: Edna Strip Mine (C-80-001) <br />Notice of Violation C-93-024 <br />OF'~~[~ <br />tip, <br />~~ ii <br />•~~• <br />. <br />~ IBTb <br />Roy Romer <br />Governor <br />Michael R Long <br />Division Director <br />We have received from The Pittsburg & Midway Coal Mining Company (P&M), a request for <br />an extension of the abatement deadline for the above mentioned notice of violation. A copy <br />of that request has been provided for your review. The notice of violation was written for <br />failure to provide adequate drainage control on the Goat Trail Access Road at the Edna Mine, <br />and was issued on April S, 1993. The deadline for abatement was set for July 4, 1993, [he <br />maximum time permitted by Rule 5.03.2(2)(b). The abatement requirements consisted of two <br />steps: 1) submit a technical revision to revise the road drainage plan, and 2) implement the <br />plan within two weeks of Division approval. The respective due dates were May 20, 1993, and <br />July 4, 1993. P&M submitted the required revision on May 19, 1993. P&M received the <br />Division's adequacy concerns on June 14, 1993, and has not yet completed a response. <br />P&M would like an extension of 60 days on the abatement deadline, to September 2, 1993. <br />I believe this is a reasonable request which complies with Rule 5.03.2(2)(c)(i), since the <br />operator has applied for a technical revision in a timely fashion. Therefore, I am requesting <br />that you authorize such an extension. <br />SLM\062893B.WP <br />
The URL can be used to link to this page
Your browser does not support the video tag.