Laserfiche WebLink
Industrial Complia•e <br />Union Tower, 165 South Union BNtl.. Suite 7000 Lakewood. CO 80228 <br />303N74-7700 FAX 303N74-7709 <br />November 28, 1994 <br />RECEIVE <br />Ms. Shawn E. Smith N0~ 3p19~ <br />Environmental Protection Specialist eo~ogY <br />Div ion oflMinerals and Geology (Dh4G~tvtslo~ of Mme`a\5 tiu <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />III IIIIIIIIIIIIIIII <br />IC Project No. 06104589 <br />Re: Technical Revision No. 28 -- Drainage Plan II for Keenesburg Mine, Colorado <br />Dear Ms Smith: <br />Per your telephone request today concerning your department's need for additional review time <br />on the above referenced project, Industrial Compliance (IC) is submitting this letter on the behalf <br />of Coors Energy for an extension to accommodate the DMG review time and for IC to thereafter <br />finalize Technical Revision No. 28 -- Drainage Plan II for the Keenesburg Mine. An anticipated <br />extension time frame should be on the order of two weeks. <br />Respectfully, <br />INDUSTRIAL COMPLIANCE <br />j~~j~~ ~ ~~Rd/i <br />Gary R. Lake, P.E. <br />Senior Civil Engineer <br />cc Dave Berry (DMG) <br />Jack Epple (Coors Energy) <br />/u/mjacks/eng/garyVdmg-smith.ltr <br />Denver • Phoenix • Kansas City • Dallas • Houston • Los Angeles • Sacramento • L~ttie Rock • Knoxville <br />A Substliary of SP Env~rpnmental Systems. Inc <br />